My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Klotz Draft Report for Fairmont Park East and Brookglen 072809
LaPorte
>
.Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Klotz Draft Report for Fairmont Park East and Brookglen 072809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:55:19 AM
Creation date
7/31/2025 11:19:24 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
7/28/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 4 <br />Option 2 M Phase I <br />SWPPP Estimated at 10°% x Cost <br />SWPPP <br />EA <br />1 <br />$ 77,648 <br />$ <br />77,648 <br />Subtotal Option 2, Phase 1 - City Constructer! Detention <br />$ <br />892,966 <br />21°% Contingency: <br />$ <br />223,239 <br />Total Construction Estimate Option 2, Phase 1: <br />$ <br />1,116,196 <br />Note: These estimates are to aid City of La Porte staff for planning purposes only. Unit prices and quantities are <br />approximate and subject to change. Engineering design methods were not per -formed to develop estimates, <br />presented herein, and shall not tie used for bidding purposes. Actual construction estimates shall be determined <br />based on performing professional engineering design services. <br />Klotz Associates Project No. 0127.011.000 13112-02-00 Drainage Study <br />,rely 2009 2 of 2 City of La Poste <br />
The URL can be used to link to this page
Your browser does not support the video tag.