My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-10-03 Fill Dirt Review Committeeminutes
LaPorte
>
.Minutes
>
Fill Dirt Review Committee
>
2003
>
07-10-03 Fill Dirt Review Committeeminutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 3:38:21 PM
Creation date
7/31/2025 11:19:34 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Fill Dirt Review Committee
Meeting Doc Type
Minutes
Date
4/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />maximum 16 feet on center along pitch of slope and equal to width of wire mesh <br />horizontally across slopes. <br />F. Immediately water sodded areas after installation. Water in sufficient amounts to <br />saturate sod and upper 4 inches of soil. <br />G. After sod and soil has dried sufficiently to prevent damage, roll sodded areas to <br />ensure good bond between sod and soil and to remove minor depressions and <br />irregularities. Ensure rolling equipment weight not over 250 pounds or less than 150 <br />pounds. <br /> <br />3.06 Maintenance <br /> <br />A. Begin maintenance of plant materials immediately after planting and continue <br />maintenance until issuance of Certificate of Acceptance of project. <br />B. Maintenance to include measures necessary to establish and maintain plants in a <br />vigorous and healthy growing condition, including the following. <br />1. When herbicides are used for weed control, apply in accordance with <br />manufacturer's instructions. Remedy damage resulting from use of herbicides. <br />2. Watering sufficient to saturate root system. <br />3. Disease and insect control. <br /> <br />3.07 Measurement and Payment <br /> <br />Measure by the square yard of area sodded. Payment for work under this Item will be <br />made at contract price for "Full Sodding,. or "Strip Sodding", as indicated on <br />PROPOSAL, which price to be full compensation for all fertilizer, sod, equipment, <br />materials, and labor necessary for fertilizing and sodding. <br /> <br />8-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.