Laserfiche WebLink
<br />Item 162 <br />Page -3- <br /> <br />e <br /> <br />FORP~ECTSINITIATED <br />AFTER OCTOBER 1, 2002 <br />REVISION 5 <br /> <br />The Contractor shall be responsible for one (1) mowing per month <br />between the months of April to October. The Contractor shall also be <br />responsible for one (1) mowing every six (6) weeks between the months of <br />November to March. <br /> <br />In addition, the Contractor shall water all sodded areas as often as <br />necessarv to establish satisfactOlY growth and to maintain its growth <br />throughout the duration of the project. <br /> <br />Contractor shall make as many repeat plantings as necessary to achieve a <br />minimum of Q~% of the area planted covered with the specified grass with <br />no bare or dead spots greater than 10 square feet. Such replanting is to be <br />performed within 14 calendar days of notification by the Engineer. <br /> <br />162.5 Measurement. Work and acceptable material for block sodding shall be <br />measured by the square yard, complete in place. <br /> <br />162.6 Payment. Work performed and material furnished under "Measurement" <br />shall be paid for at the unit price bid for "Block Sodding", which price shall <br />be full compensation for furnishing materials, preparation of ground for <br />planting, planting of sod, pegging of sod. raking, fertilizing, watering, <br />sprinkling, maintenance, and for labor, tools, equipment and incidentals <br />necessary to complete the work. Additional payment shall not be made for <br />those areas that are renlanted. <br /> <br />END OF ITEM 162 <br /> <br />X:\jpepas\2002 spec complete in WOm\2002 specs woo summaries\item 162.doc <br />