Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />ESTIMATE OF STAFF RESOURCES <br />For <br />INCREASED ENFORCEMENT OF PERMIT COMPLIANCE <br /> <br />In order to have continual follow-up on each permit under the current permitting system, it is <br />estimated that approximately 5-1/2 to 7-1/2 man-hours will be needed. <br /> <br />This includes discussing the proposed drainage plan, attaching backup data, issuing the permit, <br />driving time to and from the site, reinspection, meeting with or phone call with permittee for <br />reinspection, release or letter of substantial completion. <br /> <br />This assumes perfect construction found after first reinspection and does not include the counting <br />of trucks. <br /> <br />*Note: There were 61 open permits at the time of moratorium commencement. <br />