<br />•
<br />~'
<br />CONTECH ENGINEERING, INC.
<br />Charles R. Gipson, P.E.
<br />Condensed Resume
<br />Background
<br />-+- B.S. Chemical Engineering, 1967
<br />The University of Texas (Austin, Texas)
<br />+ Registered Professional Engineer (Texas #34621) 1973
<br />Experience
<br />+ 1983 Project Manager, Utility Monitoring Project,
<br />ARCO Petroleum Products Company, Houston, Texas
<br />I
<br />~ + 1982 Project Manager, Gasoline Blending Project,
<br />ARCO Petroleum Products Company, Houston, Texas
<br />+ _1981 Project Manager, Warrengas Terminal Instrument & Power
<br />.Revamp, Warren Petroleum Company, Galena Park, Texas
<br />+ 1980 Section Supervisor, Instrumentation and Electrical,
<br />Exxon Coal Liquefaction Plant, Baytown, Texas
<br />+ 1979 Field Engineer, Exxon Project Management Team,
<br />Exxon Coal Liquefaction Plant, Baytown, Texas
<br />+ 1978 Project Engineer, Exxon Project Management Team,
<br />Exxon Coal Liquefaction Project,
<br />Arthur G. McKee Offices, Cleveland, Ohio
<br />+ 1977 Start-up Advisor, Alyeska Pipeline Service Company,
<br />Trans-Alaska Pipeline Start-up, Prudhoe Bay, Alaska
<br />+ 1976 Project Engineer, Union Carbide, Ethylene Oxide Unit
<br />Analyzers and Sample Systems, Seadrift, Texas
<br />+ .1975 Project Engineer, Exxon Chemical Company, Butyl
<br />. Rubber Plant Computerization, Baytown, Texas
<br />+ 1974 Field Engineer, Exxon Project Management Team,
<br />Lago Hydrodesulfurization II, Aruba, Netherlands
<br />Antilles
<br />~ + 1973 Project Engineer, Crude Topping Units Control
<br />Consolidation, Conoco, Inc., Ponca City, Oklahoma
<br />i_
<br />+ 1972 Instrument Start-up Engineer, Diamond Chemical Company
<br />Chrome Plant, Wilmington, North Carolina
<br />+ 1971 Project Engineer, Armco Steel Company, Direct
<br />Reduction Unit Analyzers, Houston, Texas
<br />
|