Laserfiche WebLink
<br />April 19, 1982 <br /> <br />REPORT OF COMMITTEE ACTION <br /> <br />TO: <br /> <br />Carey Burnley, <br />Chairman, La Porte Area Water Authority <br /> <br />FROM: <br /> <br />Travis Doughty and Al Fields <br />Committee to Evaluate Engineering Services for Feasibility Study <br /> <br />We are currently researching and developing a list of Engineering Firms which <br />we believe would qualify for the subject project. The list is being developed <br />with the following qualifications in mind. <br /> <br />(1) The firm should be of sufficient size to insure that the total project, <br />both in the feasibility study and the final project engineering could be <br />accomplished "in-house" with current staff. <br /> <br />(2) The firm should furnish a list of several contracts equal in size and scope <br />to our proposed project with the additional restrictions of 3 or more <br />projects completed within the last 10 years. <br /> <br />(3) Local or Houston area home office or branch office to facilitate <br />communication lines to board. <br /> <br />(4) An established positive reputation with the industry and with previous <br />clients. <br />