My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-03-09 Special Called Regular Meeting of the La Porte Development Board of Directors
LaPorte
>
.Minutes
>
La Porte Development Corporation/Type B
>
2000's
>
2009
>
08-03-09 Special Called Regular Meeting of the La Porte Development Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:22:24 PM
Creation date
7/31/2025 11:23:58 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Minutes
Date
8/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Task <br /> <br />1. Assessment of existing conditions, parking, buildings and land uses; <br />preparation of basemap and <br />i-day Kick off meeting w/city and county to program shared <br />o ortunities with s Ivan beach and other ke lannin elements <br /> <br /> <br /> <br />3. Transportation traffic and street design assessment of West Main, <br />Broadwa ,Farimont and San Jacinto (4 corridors) <br /> <br />4. 2-day Design charrette for the 4 corridors as well as integrated Sylvan <br />Beach mixed use develo ment a roach <br /> <br />5. Draft Master Plan for 4 corridors and ingegrated Sylvan Beach at <br />Building Scale for 4 Corridors and Sylvan Beach; <br />Three (3) perspective renderings; and <br />Master Plan Report including recommendation on conceptual <br />transportation design recommendations and refinements to the <br />Economic Develo ment Plan (finalized before code) <br /> <br />6. i-Day workshop with City and County to determine final revisions for <br />Master Plan, CIP Priorities for implementation, governance needs and <br />initial structure of new code <br /> <br />7. Final Revised Master Plan (only 1 revision included; additional <br />revisions riced on houri basis <br /> <br />8. Preparation for and facilitation of Joint worksession-- Council and P&Z <br />to review master Ian and code im lementation strateg <br /> <br />9. Draft form-based Code to implement plan for 4-corridors and Sylvan <br />Beach Mixed Use Plan <br /> <br />10. Preparation for and facilitation of Community Meeting to review draft <br />form-based code <br /> <br />11. Revise form-based Code based on communi input <br /> <br />12. Preparation for and facilitation of Planning Commission Meetings for <br />Code Adoption and rezoning (2 meetings included; additional meetings <br />riced on an houri basis) <br /> <br />13. Preparation for and facilitation of City Council Meetings for Code <br />Adoption and rezoning (2 meetings included; additional meetings priced <br />on an houri basis) <br /> <br /> <br /> <br />Sub Tot. <br /> <br />$12,875 <br />$14,375 <br /> <br />$10,750 <br /> <br />$31,000 <br /> <br />$36,875 <br /> <br />$6,250 <br /> <br />$4,175 <br /> <br />$7,500 <br /> <br />$22,250 <br /> <br />$5,250 <br /> <br />$2,550 <br /> <br />$7,625 <br /> <br />$7,625 <br /> <br />$169,100 <br /> <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.