My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-10-11 Special Called Regular Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
.Minutes
>
La Porte Development Corporation/Type B
>
2010's
>
2011
>
01-10-11 Special Called Regular Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:22:24 PM
Creation date
7/31/2025 11:24:11 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Minutes
Date
1/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />New, Renovation, or Demolition <br /> <br />P & Z, 2-19-09 <br /> <br />Design Certificate <br /> <br />acceptable designs and ask questions before you begin the process of planning your project, as well as <br />familiarize the MS DART with the general nature of your project. <br /> <br />2. Applications for a Main Street Design Certificate (MS DC) must be consistent with the City's Building, <br />Zoning, and Fire Codes and go through the standard permitting process. Receipt of a Main Street Design <br />Certificate is required before the Permitting Division or Planning Department may approve your plans. <br /> <br />3. Submit your completed Main Street Design Certificate packet to the Main Street Development office at <br />604 W. Fairmont Parkway. The packet should include the following: <br /> <br />o <br /> <br />A completed Main Street Design Certificate Application .form <br /> <br />A scaled drawing by the prQj~ct architect or d~$ign pro~es.$ional of all proposed work. <br /> <br />Include sampl~$":su~h~>'pa~i1t s~~ple&,fa~ric swat~r~~;sign mat~ri9rl,etc. Provide any additional <br />items that wilhenable ~lsIfS pART to en:vision the fil1ishedprojeSi~ <br /> <br />Furnish pltotographs9fthe building's e~terior, anf any other sitelocat~9nsthatfe included in your <br />application (p11otos ~e also required upon completion) along with h.istoric Photographs of the <br />building. <br /> <br />Additiol!'~$gJ)missions may.~.. req uested if deeme(\ipe~~~~tl:ttodesign.r~yie~decisions. <br /> <br />. <br /> <br />. <br /> <br />I) <br /> <br />G <br /> <br />. <br /> <br />ProJectcstimates and any other i~~m~ that will be helpful~~f)n:v~yingYO\lr <br /> <br />toMS DART <br /> <br />.0 . ..,....'> <br /> <br /> <br />FACTORS CONSlDEREDFoR CERTIFICATION .. ... <br />Before approving an application, the MS DART must find that the application satisfies the following general <br />criteria: <br /> <br />. <br /> <br />The architectural and historic integrity of an illdividual historic structure is preserved; <br />New buildings or additions should be designed compatible with the nmge of architectural styles <br />found on the north side ofthe300 block ofMai -from the late 1800's to the 1950's; <br />Existing structures should either con:vert to their original historic condition or be renovated to resemble <br />their current look; <br />The overall character of the Main Street District is protected and enhanced. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />The Main Street Design Guideli>~e$~Resourc~ i'1~teria.!/?a~~p~~i1 compilydt6 help explain in general terms <br />the aesthetics the MS DART is t(;lsponsible for in the Main Street District. <br /> <br />REVIEW & ApPROVAL PROCESS <br />1. Upon receipt, the Main Street Coordinator will review the packet to verify all pertinent information is <br />enclosed. Once the completed packet is received it will be forwarded to the MS DART for their <br />recommendation. If packet is incomplete, you will be notified and may be asked to pick it up and return it <br />completed. <br /> <br />2. After due consideration, the MS DART will approve or disapprove the application by majority vote, and <br />be signed by the City Manager's office. The best assurance you have for a project to be approved is to <br />work closely with the MS DART at every juncture of your project. In an effort to make it feasible for you <br />to resubmit a successful packet, they will state the reasons it was denied. The decisions made by the Main <br />Street Design Assistance Review Team may be appealed to the Planning and Zoning Commission if <br />resolution is not obtained. <br /> <br />3. Upon receipt of your Main Street Design Certificate, the Permitting Division and Planning Department <br />may proceed with any applications you have on file with them. They cannot approve permits without a <br />design certificate. <br /> <br />City of La Porte - Main Street Program <br /> <br />20f5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.