Laserfiche WebLink
<br />BUSINfSS. BY IHf DAY. <br /> <br />s That the project will complement the surrounding buildings <br />iJ That the project will add value to the City of La Porte <br />7. Grant applications and awards can be made in any of the reimbursable activities described <br />above and may be combined for any single property or project. An applicant is defined as an <br />owner, tenant, or combination thereof occupying an eligible property within the Main Street <br />Overlay District. A single owner of multiple properties may apply for grant funds for each <br />property owned but the match must be for no less than $2,500, and the owner may not receive <br />more than $25,000 per property in a three (3) year period. <br /> <br />APPLlCA liON PROCESS <br /> <br />1. Determine eligibility: Discuss project plans with Main Street/Economic Development <br />Coordinator. Coordinator will set up a pre-development meeting with the EGEC. <br />2. Fill out the application and sign the agreement form. All grant applications must include the <br />following: <br />a. A scale drawing by the project architect or design professional of all grant work. <br />b. Samples-e.g. paint samples, fabric swatches, sign material, etc.-that will enable the <br />EGEC to envision the finished project. <br />c. Itemized work estimates on all project work from contractors or project architects. <br />Self-contracted work will be reimbursed for actual legitimate expenses, excluding <br />labor. <br />d. Photographs of the building's exterior. The Applicant shall be required to provide <br />before and after photographs of the building before the reimbursement grant can be <br />awarded. For the initial application, before photographs will suffice, but photographs <br />of the completed project must be submitted before the grant can be considered for <br />approval. <br />3. Return the completed application form, with all applicable items, to the Economic <br />Development Office, 604 W. Fairmont Parkway, La Porte, TX 77571. <br />4. Application will undergo an approval process, which includes but is not limited to the <br />following: <br />a. All projects must meet current building standards and codes, as well as building <br />permit requirements. <br />b. The EGEC will only consider applications that have been properly and fully <br />completed and which contain all information requested in the application and/or by <br />the committee. <br />c. All construction bids submitted by the Applicant must be current and must be dated <br />no earlier than ninety (90) days prior to the Application request. Bids shall be <br />submitted on the contractor's or project architect's letterhead and shall contain the <br />contractor's name, address, and telephone number and shall itemize the bid in a <br />manner that allows the EGEC to determine the bid components and authenticity of <br />the bid. <br /> <br />ENHANCEMENT GRANT <br />PROGRAM DESCRIPTIIOt-l, PAGE 2 <br />