My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-10-11 Special Called Regular Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
.Minutes
>
La Porte Development Corporation/Type B
>
2010's
>
2011
>
01-10-11 Special Called Regular Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:22:24 PM
Creation date
7/31/2025 11:24:11 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Minutes
Date
1/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DUSINfSS. BY IHf 8A Y. <br /> <br />Please list Contractor and/or Project Architect Proposals and Total Amounts (attach original proposals): <br /> <br />CONTRACTORIPROJECT ARCI-HTECT <br /> <br />TOTAL AMOUNT <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />1. <br /> <br />2. <br /> <br />3. <br />4. <br />5. <br /> <br />BUDG~T D~T AIL: <br /> <br />PROJECT EXPENDITURES FUNDS REQUESTED FUNDS APPLIED TOTAL <br />I=acsade Rehab $ $ $ <br />Awnings/Signage $ $ $ <br />Beautification $ $ $ <br />Other (list): $ $ $ <br />Other (list): $ $ $ <br />TOTALS $ $ $ <br /> <br />Total estimated cost of proposed project: $ <br /> <br />Amount requested (up to 50% of total cost, $2,500 to $25,000): $ <br /> <br />Please attach color samples, model numbers (for windows, doors, etc.), photos, scale drawing, and other <br />illustrations of work to be completed. Please include as much detail as possible. <br /> <br />Vour signature on this application certifies that you understand and agree with the following statements: <br /> <br />I have met with the EGEC and I fully understand the Enhancement Grant procedures and details established. I <br />intend to use these grant funds for the renovation projects, as spelled out in the application. I have not <br />received, nor willi receive insurance monies for this revitalization project OR I have disclosed all pertinent <br />insurance information. <br /> <br />I understand that if I am awarded an \;nhancement Grant, any deviation from the approved project may result <br />in the partial or total withdrawal of the grant funds. If I am awarded a reimbursement grant for fa<;:ade, awning, <br />signage, beautification, or other approved work, alterations should not be made within five (5) years from <br />construction; otherwise I may be required to reimburse the La Porte \;conomic Development Corporation <br />immediately for the full amount of the grant. <br /> <br />APPLICANT SIGNATURE <br /> <br />DATE <br /> <br />ENHANCEMENT GRANT <br />APPLICATION. PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.