Laserfiche WebLink
<br />Exhibit B <br /> <br />The TIRZ hnprovements <br /> <br />Public Improvements <br />Excavation & Fill Placement for Detention <br />100% of Off-Site Sanitary Sewer System <br />100% of Oversized On-Site Sanitary Sewer <br />100% of Collector Road <br />35% of On-Site Water Distribution System <br />35% of On-Site Sanitary Sewer System <br />35% of On-Site Storm Sewer System <br />35% of Site Preparation <br />35% of Storm Water Pollution Prevention <br />Engineering (15%) <br />Contingency (15%) <br /> <br />Subtotal <br /> <br />100% Public Landscaping <br />100% Land Cost for Detention <br />100% Land Cost for Collector Road <br />100% Land Cost for Open Space/Park/Recreation <br /> <br />Subtotal <br /> <br />Grand Total <br /> <br />B-1 <br /> <br />Cost Estimate <br />$745,031.00 <br />$1,019;484.00 <br />$187,590.00 <br />$255,000.00 <br />$158,322.50 <br />$337,104.60 <br />$545,211.10 <br />$167,959,75 <br />$96,169.85 <br />$526,780.92 <br />. $605,798.06 <br /> <br />$4,644,451.78 <br /> <br />$1,481,176.00 <br />$670,941.30 <br />$84,899.43 <br />$222,031.36 <br /> <br />$2,459,048.09 <br /> <br />$7,103,499.87 <br />