My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-12-05 La Porte Redevelopment Authority Meeting minutes
LaPorte
>
.Minutes
>
LP Redevelopment Authority
>
2000's
>
2005
>
10-12-05 La Porte Redevelopment Authority Meeting minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 4:29:10 PM
Creation date
7/31/2025 11:25:09 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Redevelopment Authority/TIRZ
Meeting Doc Type
Minutes
Date
10/12/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.....;~ <br />',' <br /> <br />~,~ <br /> <br />-;;;:~ <br /> <br />~ Receive and respond to RFl's; <br />~ Prepare and administer change orders, as needed; <br />~ Review and certify contractor's applications for payment; <br />~ Perform a minimum of three site visits per month to evaluate and/or assess RFl's, <br />change Orders, or other construction and engineering issues that warra!?t on-site <br />observation and assess the progress of the work to aid in review and cerofication of pay <br />applications; and. . <br />~ Coordinate work as necessary with the geotech empioyed by the Owner. <br />In addition to bidding and construction administration services,loN DESIGN and agents will <br />provide field surveying services as follows: - . <br /> <br />~ One construction staking event for utilities and pavement; and, <br />~ One iot comer staking event upon completion of construction. <br />Deliverables: One project manual will be delivered to the Owner for his use; reproduction costs <br />for the drawings and project manual to be distributed to each bidder Will be cOnsidered a <br />reimbursable expense. A digital bid tabulation spreadsheet Will be d~livered electronically to the <br />Owner withIn three. working days of opening all received bids. ION DESIGN will make .~ written <br />recommendation for contract award after the bid. tabulation and other factorS have been <br />reviewed. Documents to support RFI responses, change orders, and pay applications wil1 be <br />produced as needed. <br /> <br />/ <br /> <br />Project Closeout (proposed as hourly services at direction of Owner) <br />· Project review with agency /Owner for constniction closeol!t <br />· Assistance to Owner on contract closeout <br />· Preparation of Record drawings for Owner/agency <br />At the conclusion of the project, closeout activities include preparation of record drawings and <br />transfer of file information for archive with !he review agency and awner. <br /> <br />. <br /> <br />ION DESIGN GRoup 2800 N. HENDERSON AVENUE, SruolO 100 DALlAS. TX 75206 <br />214..370.3470 TB.. 214.370..3083 FAX BRYAN@lONDESIGNGROUP.NET <br />
The URL can be used to link to this page
Your browser does not support the video tag.