My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-12-05 La Porte Redevelopment Authority Meeting minutes
LaPorte
>
.Minutes
>
LP Redevelopment Authority
>
2000's
>
2005
>
10-12-05 La Porte Redevelopment Authority Meeting minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 4:29:10 PM
Creation date
7/31/2025 11:25:09 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Redevelopment Authority/TIRZ
Meeting Doc Type
Minutes
Date
10/12/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DRAFT <br /> <br />EXHIBIT "B" ELIGIBLE ITEMS <br /> <br />In Project <br />Plans/Guidelines <br /> <br />Harris County <br />Elhdble3 <br /> <br />Est. Costs <br /> <br />1 <br />Street System <br />- Powell Rd (100' Rowi <br />- Powell Rd (60' Row) <br />- Abandon Powell Rd. <br />- Weems Blvd.2 <br />- Export Dr. (Requested) <br /> <br />-v <br />-V <br />-V <br />-V <br />No <br /> <br />-V <br />-V (Called Powell Rd. South) <br />Silent <br />-V (Called Powell Rd.) <br />No Not Eligible <br /> <br />Water Dist. System <br />- Onsite 8" & 12" Public Mains <br />- Offsite Segment Crossing SH 146 (12") <br /> <br />Yes/Implied <br />-V <br /> <br />No <br />No <br /> <br />Sanitary Sewer System <br />- Lift Station/Force Main <br />- Onsite Public Mains> 8" <br />- Offsite Public Mains <br /> <br />-V <br />Yes/Implied <br />-V <br /> <br />No <br />No <br />No <br /> <br />Drainage Projects <br />- Extension ofHCFCD Facilities <br />- Stormwater Detention/Channels <br />· Acquisition <br />· Construction <br /> <br />-V <br /> <br />-V <br />-V <br /> <br />-V <br />-V <br />-V <br /> <br />Sidewalks <br />- Along Major Roadways <br />(Discuss locations and/or swapping <br />For pedestrian trail) <br /> <br />-V <br /> <br />-V <br /> <br />1 <br /> <br />2 <br /> <br />3 <br /> <br />Includes storm sewer and curb & gutter <br />Proposed 3-lane (2 & 1 continuous turning lane) vs. 4-lane with median; will require Harris County <br />approval and consideration for future expansion. <br />Waiting on decision/action by Harris County: <br />· To manage the projects they participate in <br />· To increase the project participation amounts and remove the total cap for participation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.