Laserfiche WebLink
<br /> EXHIBIT B <br /> THE TIRZ IMPROVEMENTS <br /> Unit Estimated <br /> South Cost Cost <br /> 24" RCP 14 LF $ 70.00 $ 980.00 <br /> 24" HDPE 37 LF $ 36.00 $ 1,332.00 <br /> Pilot Channel 324 LF $ 26.66 $ 8,637.84 <br /> Rip Rap 10 CY $ 40.00 $ 400.00 <br /> Storm Sewer Manhole 1 EA $ 2,000.00 $ 2,000.00 <br /> Headwall 2 EA $ 1,400.00 $ 2,800.00 <br /> Concrete Apron 1 SY $ 39.00 $ 9.00 <br /> Excavation 3,936 CY $ 5.00 $ 19,680.00 <br /> Sanitary Sewer Manholes 1 EA $ 2,000.00 $ 2,000.00 <br /> 8" Water Line 44 LF $ 30.90 $ 1,359.60 <br /> 8x8 Tap & Sleeve Valve 1 EA $ 2,800.00 $ 2,800.00 <br /> 16" Bore & Steel Casing 66 LF $ 360.00 $ 23,760.00 <br /> Sub Total $ 65,788.44 <br /> North <br />( Concrete Pavement 194 SY $ 29.00 $ 5,626.00 <br /> 6" Lime Subgrade 284 SY $ 4.00 $ 1,136.00 <br /> 6" Concrete Curb 30 LF $ 2.40 $ 72.00 <br /> 4' Concrete Walk 60 SY $ 35.00 $ 2,100.00 <br /> 18" RCP 110 LF $ 61.00 $ 6,710.00 <br /> 24" RCP 17 LF $ 70.00 $ 1,190.00 <br /> 24" HDPE 50 LF $ 36.00 $ 1,800.00 <br /> Pilot Channel 191 LF $ 26.66 $ 5,092.06 <br /> Storm Sewer Manhole 2 EA $ 2,000.00 $ 4,000.00 <br /> 18" Pipe End Treatments 4 EA $ 500.00 $ 2,000.00 <br /> Headwall 2 EA $ 1,400.00 $ 2,800.00 <br /> Concrete Apron 1 SY $ 39.00 $ 39.00 <br /> Excavation 3,339 CY $ 5.00 $ 16,695.00 <br /> Sanitary Sewer Manholes 1 EA $ 2,000.00 $ 2,000.00 <br /> 8" Sanitary Sewer Pipe 165 LF $ 32.00 $ 5,280.00 <br /> 8" Water Line 154 LF $ 30.90 $ 4,758.60 <br /> 8x8 Tap & Sleeve Valve 1 EA $ 2,800.00 $ 2,800.00 <br /> 16" Bore & Steel Casing 54 LF $ 360.00 $ 19,440.00 <br /> Sub Total $ 83,538.66 <br /> Engineering $ 15,172.79 <br /> Total $ 164,499.89 <br /> <br />B-1 <br /> <br />HOU:2322 718. 7 <br />