My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-18-1985 Regular Meeting
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
1980's
>
1985
>
04-18-1985 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:39 AM
Creation date
7/31/2025 11:26:32 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
4/18/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~~ <br />instrument from a title guaranty company or <br />:attorney authorized to render title opinions <br />in the State of Texas, which certifies that • <br />a search of the appropriate records was • <br />performed within thirty (30) days of•the <br />filing date and which letter provides the <br />information specified in Enclosure 2 to <br />Appendix A. <br />B. Utility company letters: Letters from <br />servicing utility companies approving the <br />easements shown on the plat for their use. <br />C. Private easement holders consent: A letter, <br />statement or instrument from the holder of <br />any privately owned easement or fee strip <br />within the subdivision boundaries approving <br />any crossings of said existing easement or <br />fee strip by proposed streets, utilities, or <br />easements shown on the plat. If an <br />instrument of record is submitted in lieu of • <br />such consent, the City Attorney shall <br />approve said substitution. <br />D. Other document,: See Appendix E. <br />1. FINAL PLATS: SUBMISSION <br />Five (5) copies of the final plat certified by <br />the owners, lienholders, and engineer or <br />surveyor, and one (1) copy of all required <br />documentation shall be submitted to the <br />department for review at least two (2) weeks <br />before the date at which the final plat is filed <br />with the Commission. <br />2. FINAL PLATS: ACTION BY THE APPROVING AUTHORITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.