Laserfiche WebLink
<br />Page 2 of 2 <br />Staff Report 12/12/91 <br />Louisiana Chemical <br /> <br />* <br /> <br />The improvements by the SDH&PT will consist of an earthen channel <br />draining approximately 250 acres that will be restricted at its <br />confluence with the F101 system. Essentially this will create a linear <br />detention facility until F101 system improvements are constructed. <br />Also construction of this channel would in essence complete one of <br />the lateral channels which is part of the long term objectives of the <br />F101 Watershed Plan. <br /> <br />* <br /> <br />As a result, the conditional approval as presented and granted to <br />Louisiana Chemical on 11/21/91 cannot be fulfilled. <br /> <br />* <br /> <br />Staff has informed Louisiana Chemical's engineer of this new <br />circumstance and is continuing to work with the State and Flood <br />Control to hopefully achieve a satisfactory solution to allow for the <br />development and to protect the objectives outlined in the F101 <br />Master Watershed Plan. <br />