Laserfiche WebLink
• • <br />• Preliminary Plat Checklist Contd. <br />Page 2 of 2 <br />16. Layout & Identification: Properly noted. <br /> <br />17. Condominiums: N jA <br /> <br />18. Reserves: N jA <br /> <br />19. Streets: Properly noted. Design adequate. <br /> <br />20. Street Names: Properly noted. No name duplication. <br /> <br />21. Utility Easements: Properly noted. <br /> <br />22. Flood Hazard Area: N jA <br /> <br />23. Survey Monument Tie In: Properly noted. <br /> <br />24. Survey Control Monuments: See comments section. " <br /> <br />• B. Documentation <br />1. La Porte Development Checklist: Properly filled out and submitted. <br />2. Title Certificate: Submitted. <br />3. Utility Schematics: Submitted and reviewed by staff. <br />Comments- <br />' Engineering comnanv notified. Mvlar will reflect 4/21/94 submittal date. <br />" Five survey monuments will be required (1 for each 5 acres). Staff is working with <br />Engineer to determine most advantageous locations. Locations of installed monuments <br />to be shown on Final Plat. <br />Reviewed By: ~ Date: 4 j14 j94 <br />• <br />