My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-16-1994 Regular Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
1990's
>
1994
>
06-16-1994 Regular Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:36 AM
Creation date
7/31/2025 11:27:49 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />J• • <br />-~-.., <br />;:~. <br />~-~: <br />• <br />1-19 '~ <br />- Type F - Includes intersections formed by two secondary <br />arterials. These intersections may require signaliza- <br />'`'~ tion but generally will require signage only. <br />- Type G - Includes intersections formed by two secondary <br />~` arterials of which one ends at the intersection. These <br />-.- intersections require signage only. <br />•-_ - Type H - Includes intersections formed by the semi- <br />- controlled access highway and a secondary arterial <br />ending at the intersection. These intersections require <br />v:_ signage only. <br />-~ o Grade separation improvements - these actions include the <br />_ development of overpass and interchange structures. They <br />. ~ have been classified as follows. <br />--Type 1 - Includes three-or-more-level highway-to-highway <br />interchanges. <br />- Type 2 - Includes two-level diamond highway to thorough- <br />fare interchanges. <br />,._.. • <br />•--• - Type 3 - Includes the overpass of a bridge or thorough- <br />• fare. • <br />In addition, the Thoroughfare Implementation Map identifies <br />the proposed priority projects for the Thoroughfare Plan's V;• <br />successful accomplishment. These are listed in order of priority. <br />o Priority 1 Projects <br />- Improvement of the SH 225/SH 146 interchange to a four- <br />._..; level interchange which should include the flyover of <br />_ the median lanes of SH 146 over Southern Pacific's <br />railroad tracks. The development of this project is a <br />responsibility of the State Department of Highways and <br />--• Public Transportation (SDHPT). It should be noted that <br />••• this proposed action is highly dependent on the con- <br />struction of the proposed bridge on SH 146 connecting <br />.• Baytown to SH 225. The construction of this project <br />.• has been delayed due to lack of available funding. <br />- Development of an alternate truck route to the Barbours <br />'~-' Cut Port Facility from SH 146 to Barbours Cut Blvd. <br />`~-~ through L Street and Broadway. This project must be <br />TurnerCollie c~Br~den Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.