Laserfiche WebLink
• • <br />• Preliminary Plat Checklist Contd. <br />Page 2 of 2 <br />16. Layout & Identification: Shown <br /> <br />17. Condominiums: N jA ' <br /> <br />18. Reserves: N/A <br /> <br />19. Streets: Shown <br /> <br />20. Street Names: Shown '1 <br /> <br />21. Utility Easements: Shown <br /> <br />22. Flood Hazard Area: Shown `2 <br /> <br />23. Survey Monument Tie In: Shown <br /> <br />24. Survey Control Monuments: Shown <br /> <br />25. Schematic Utility Layout: N jA '3 <br />• (If Applicable) <br />B. Documentation <br />1. La Porte Development Checklist: On file <br /> <br />2. Title Certificate: Submitted and on file. <br /> <br />3. Utility Schematics: N/A '3 <br />Comments: <br />Sections I & II are developed with condominium units. Section III is to be developed <br />with zero lot line, detached patio homes. `1 Names of adjacent public r-o-w's are shown. <br />Private streets provide internal circulation. These streets, which akeady exist, are <br />unnamed. '2 Section III lies in an "x" zone. This is noted on plat. '3 Utilities for this <br />section have already been constructed. inspected. and accepted by the City of La Porte. <br />Utilities for the entire complex were installed at the same time. <br />Reviewed By: ' "~' Date: 2 6 ~ ~ <br />• <br />