Laserfiche WebLink
• • <br />• Staff Report February 16, 1995 <br />Woods on the Bay Subdivision, Section III <br />Final Plat <br />B <br />Item No. III on the agenda is to consider approval of the Final Plat for Woods on the Bay <br />Subdivision, Section III (see Exhibit A). Woods on the Bay is a 12.7 acre subdivision <br />located between Old Hwy. 146 and Galveston Bay. Sections I & II are platted and <br />developed as a neighborhood of condominium townhomes. Section III, which will occupy <br />2.69 acres of the tract is to consist of 20 lots in 4 blocks. It is to be developed with zero lot <br />line patio homes. In April of 1982, Section I of the Woods on the Bay Subdivision was <br />approved by the City of La Porte Planning and Zoning Commission. Section II was <br />approved in September of the same year. Section III was intended to be developed at a <br />future date depending on the real estate market. Section III never received plat approval <br />and remains undeveloped except for utilities and streets (see Exhibit B). <br />Infrastructure for the entire subdivision was constructed at one time. The private streets <br />referenced on the plat are currently in place and in service. As illustrated on Exhibit B, <br />because of the subdivision's overall design, it was necessary to extend the streets through <br />Section III. <br />Sanitary sewer, potable water, and franchise utilities (electricity, telephone, etc.) are also in <br />. place and in service. As with the streets, it was necessary to install these utilities in Section <br />III in order to provide service for Sections I & II. Water and sanitary sewer lines have been <br />dedicated as City mains. They were approved and accepted by the City of La Porte in 1982. <br />Street lighting and storm sewer systems are also in place for the entire subdivision. The <br />street lighting system, as with the roads, is privately owned by the subdivision. The <br />homeowner's association is, by covenant, responsible for the operation and upkeep of the <br />street lighting system. <br />~• <br />The Section III plat is being presented for the Commission's review as both a Preliminary <br />and Final Plat. Staff, using Development Ordinance 1444, Zoning Ordinance 1501, and the <br />City's Comprehensive Plan as guides, has reviewed this plat. With the exception of two <br />minor "housekeeping" items, staff finds this plat to comply with all applicable City of La <br />Porte requirements. There are three components to the review conducted by staff. They <br />are as follows: <br />• ZoningJComprehensive Plan Issues: This review included items such as <br />compliance with zoning district regulation, lot size requirements, Land Use <br />Plan and Utilities Plan. Staff found the plat to be in compliance with all <br />applicable requirements. A checklist of all the items reviewed is attached and <br />• follows this report. <br />