Laserfiche WebLink
• <br />• <br />Preliminary Plat Checklist Contd. <br />Page 2 of 2 <br />15. Building Lines: <br />16. Layout & Identification: <br />17. Condominiums: <br />18. Reserves: <br />19. tree <br />20. Street Names: <br />21. Utility Easements: <br />22. Flood Hazard Area: <br />23. Survey Monument Tie In: <br />24. Survev Control Monuments: <br />25. Schematic Utility Layout: <br />Properly noted. <br />Correction of Lot numbers in Block 1 <br />required. <br />N/A <br />N/A <br />Properly noted. Design adequate. <br />Properly noted. No name duplication. <br />H.L. & P. easements not shown. <br />N/A <br />Not shown. <br />Not shown. <br />Under staff review. <br />(If Applicable) <br />B. Documentation <br />1. La Porte Development Checklist: Properly filled out and submitted. <br />2. Title Certificate: Not submitted. <br />3. Utility Schematics: Under staff review. <br />omments: <br />* HL&P street light layout plan and installation cost letter. <br />Also. astreet/alley closing will need to be completed prior to Preliminary Plat approval. <br />Reviewed By: Debbie Wilmore Date: 11-13-96 <br />