My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-16-1997 Public Hearing and Regular Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
1990's
>
1997
>
01-16-1997 Public Hearing and Regular Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:35 AM
Creation date
7/31/2025 11:28:11 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
1/16/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />Proposed Texas Import/Export Industrial Park <br />Overview• <br />The following development proposal spans many critical Comprehensive Plan issues. If this plan <br />were approved, it would represent a major policy shift from the Comprehensive Plan. The purpose <br />of this presentation is to give Staff and the Planning & Zoning Commission a greater understanding <br />of the possible development of more than 250 acres of land within the City of La Porte. A careful <br />analysis of the impact of the project on the community versus the benefit would need to be <br />developed before Staff could recommend in favor or against a project of this kind. Staff does not <br />have any recommendations at this time. The following description was developed by the Developer <br />and is intended for information purposes only. I think we should ask as many questions as possible <br />during this presentation. <br />Description of Project: Brief of Develocers Summary) <br />The Texas Import/Export Industrial Park is a project presently in the planning stage by the current <br />owners of the property. The proposed development would occupy 252 acres north of Mc Cabe Road <br />between State Highway 146 and the Bayport Industrial District. The Development would be a mixed <br />use industrial park which would include warehousing, packaging, office and retail with related <br />transportation infrastructure of rail and connecting roads. The total projected development costs over <br />the next 5 years will be approximately $200,000,000. <br />The westerly 87 acres of the development adjoining the Bayport Industrial District and the existing <br />Union Pacific rail line would be developed into a rail and truck handling area with related support <br />facilities. This transportation infrastructure would include an area for the storage of a 1,000 to 1,500 <br />rail cars transloading facilities for movement of products to the trucks. On the east side of Powell <br />Road dock high warehouse and packaging buildings would be constructed in acampus-type setting. <br />These structures would be of architectural concrete design situated in a well landscaped, esthetically <br />pleasing surrounding with a plan and design for the total development which would present an <br />architectural continuity between structures. This area would accommodate approximately 2.5 million <br />square feet of warehouse and packaging space and require an approximately $90,000,000 investment. <br />The remaining 20 acres adjoining State Highway 146 and Mc Cabe Road would be developed into <br />offices and retail complexes which would accommodate the needs of the adjoining area facilities when <br />fully developed. <br />The transportation infrastructure including rail, streets, sound abatement, landscaping, and Phase I <br />streets and connecting roads for the warehouse development would be completed within 18 months of <br />the start of construction, projected for completion during the 4th quarter of 1998. It is also projected <br />that the warehouse and packaging facilities would be constructed and occupied at a rate of 500,000 <br />square feet per year thereafter. Office and retail construction would begin approximately 12 months <br />after initial construction begins and can be completed within a 4 year period. The total project would <br />be completed within a 5 year time frame. <br />
The URL can be used to link to this page
Your browser does not support the video tag.