My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-20-1997 Regular Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
1990's
>
1997
>
03-20-1997 Regular Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:35 AM
Creation date
7/31/2025 11:28:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
3/20/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Spencer Landing Subdiv. ~neral Plan • <br />4/17/97 - P & Z Meeting <br />Page 2 of 2 <br />1) Any deficiencies shown on the General Plan Checklist should be <br />provided by the developer. <br />2) Restricted Reserve "A" has been reduced from 7.2529 acres to 4.214 <br />acres and has been identified as "restricted for detention and <br />recreational use". The developer should provide adequate <br />information so the Commission and staff can address any remaiting <br />issues. <br />a) Is the reserve still a combination fishing pond and on-site <br />detention area? <br />b) Is a small park area for children still located within this <br />reserve? <br />c) The new pond design (depth, maintenance, ownership, etc.) <br />has not been provided. <br />d). Fencing needs to be addressed. <br />3) Water, sewer and stormwater need to be relocated prior to the <br />submittal of the amended general plan. These new locations will <br />also need to be shown on the Phase I and II preliminary plats. <br />a) For maintenance reasons, the layout of the sanitary sewer <br />needs to be adjusted so that all lines are in the street right-of- <br />way whenever possible. Back lot sewer facilities are not <br />desirable. The subdivision designer can visit with the City <br />Engineer to ensure proper locations of lines. <br />b) For maintenance reasons, the layout of the water lines needs <br />to be adjusted so that all lines are in the street right-of--way <br />whenever possible. Back and side water facilities are not <br />desirable. The subdivision designer can visit with the City <br />Engineer to ensure proper location of lines. <br />c) For maintenance reasons, side lot storm sewer lines are not <br />desirable. Route in street right-of--way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.