My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-15-2004 Regular Meeing and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2004
>
01-15-2004 Regular Meeing and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:55:38 PM
Creation date
7/31/2025 11:29:26 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
1/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Staff Report Fairmont Park East Business Park February 19, 2004 <br />Unrestricted Reserves — Final Plat <br />Requested By: Eddie V. Gray, Trustee, Fairmont Park, JV. <br />Requested For: A 4.619 acre tract out of an 10.5974 acre tract (TR 32, Fairmont Park, JV.), <br />located in the William M. Jones Survey, Abstract-482, City of LaPorte, <br />Harris County, Texas. <br />cation: 10400 Block of W. Fairmont Parkway, at the northeast comer of Fairmont <br />Parkway and Farrington Blvd. <br />Present Zoning: ' General Commercial (GC) <br />Background: During the January 15, 2004 meeting, the Commission asked the developer <br />to address the following items related to this project: <br />• Provide a controlled access easement for unrestricted reserves 2, 3, 4, 5, <br />and 6 along Fairmont Parkway. The driveways should be limited to 2-3. <br />• Developer to work with staff and look into common access limiting <br />driveways on Fairmont Parkway. Check with mortgage companies's <br />lending practices for properties that share access. <br />• Submit a final plat along with all applicable documents. <br />• Submit construction drawings showing water, sanitary sewer, and storm <br />water management. <br />• Provide covenants, conditions or restrictions for the proposed business <br />park. <br />• Secure a driveway easement to the rear of all properties that exit on <br />Farrington Blvd. <br />To accomplish the above, the Commission agreed to approve the preliminary <br />plat for Fairmont Park East Business Park conditionally. <br />The applicant owns approximately 20-acre tract or parcels of land along both <br />sides of Farrington Blvd. The area under consideration comprises 4.619 <br />acres of land to the east of existing commercial uses along Fairmont <br />Parkway. The property will be identified as Fairmont Park East Business <br />Park, Unrestricted Reserves 1, 2, 3, 4, 5, and 6. The owner has proposed <br />unrestricted commercial reserves for the purpose of developing <br />miscellaneous commercial developments. <br />Staff held meetings with the developer to address the above issues and <br />secure controlled access easement along Fairmont Parkway. As directed by <br />the Commission, the developer has to provide sidewalks that would provide <br />pedestrian access to connect Big Island Slough to the Exxon -Mobil Pipeline <br />
The URL can be used to link to this page
Your browser does not support the video tag.