My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-17-2004 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2004
>
06-17-2004 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 3:08:00 PM
Creation date
7/31/2025 11:29:36 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/17/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
La Porte Golf Community <br />SCU#04012 <br />July 15, 2004 . <br />Page 5 of 7 <br />• Construction Schedule —Given recent delays in the Hettig project, the <br />original start date of January 2004. has been delayed considerably. With <br />a late 2004 start date, the project should reach build out in 2011-2012. . <br />Recommendation: Based on items discussed under the "Analysis" section, Staff recommends . <br />Planning and Zoning Commission's approval with the following conditions <br />for - adoption of a-. Special Conditional - Use Permit, and direct staff to <br />coordinate a Developer's Agreement with the applicant. The conditions are <br />listed below: <br />Land Use: <br />1.: Allow single-family lots with '70' along the Golf Course. and <br />60' to 65' width lots in other areas. . <br />2. Maintain the redesign of the single-family lot layout so that <br />lots do not front on e. Street: <br />3. Allow commercial development near McCabe 8i SHA46 <br />(approximately: 5. acres thereby qualifying for a PUD). A <br />further 'refinement , of: the' commercial activity'. will . be <br />determined when the Development Agreement is created. <br />4. • A 20 acres tract in center of ' development remains- PUD <br />without. land use designation. - But, underlying land use from <br />the. Comprehensive Plan indicates single-family residential.. <br />Streets: <br />1. Remove existing chain link fencing _ on border of golf: course <br />Preperi3'� <br />2. Avoid using 8a' Street during construction phases . of <br />devleopment: . <br />3'. Provide emergency access to the. golf. course from McCabe . <br />Road area (alley and gate) to allow. ambulance into this. area of <br />the -course. <br />4. Center turn lanes on Wharton Weems should be considered'. <br />: "5. Traffic signal on. Wharton Weems and S.H. 146 is needed at the <br />time - the subdivision is . developed. The .Developer should <br />coordinate with TXDOT. Traffic impact study shall be initiated <br />to look at the need for widening and additional lanes- at <br />Wharton Weems with crossover. consideration in conjunction <br />with improvements on S.H: 146 . <br />6.: 8a' Street not to go .through. Design adead-end with a <br />temporary cul-de-sac added until it is determined if additional <br />ROW is needed for park access. <br />7.. A possible redesign of Section 5 may be needed to allow <br />secondary access to S.H. 146 and roads may have temporary cul- <br />de-sacs to plan for future tie-ins between Section 5 and Section 3. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.