My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-15-2004 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2004
>
07-15-2004 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
7/31/2025 11:29:38 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
7/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />O~ A <br />~ 09 CITY OF LA PORTE PLANNING DEPARTMENT <br />~ .~ 604 W. Fairmont Parkway, La Porte, TX 77571 <br />v ,~f ' ~ www.ci.la-oorte.tx.us <br />/ / ~. A. Phone: (281) 471-5020 I Fax (281) 471-7168 <br />rE XAe <br />MEMORANDUM FOR RECORD <br />MARCH 29, 2004 <br />TO: Director of Planning <br />FROM: City Planner <br />Re: Developer Responses to City of La Porte's Requests, The Preserve at Taylor Bayou. <br />To date, the City of La Porte has received the following responses to issues and concerns from <br />the Developers and/or Engineers working on "The Preserve at Taylor Bayou" project: <br />ISSUE/CONCERN: New application for a Special Conditional Use Permit (SCUP) <br />based upon current zoning. <br />RESPONSE: Completed. <br />ISSUE/CONCERN: New general plan to be filed identifying Location of lift station and <br />easements; Wetlands; SW Bell Station; Trails; Public Parkland. <br />RESPONSE: Completed.. It should be noted that the location of the Lift Station must be <br />verified (see discussion on page 2 this memorandum). <br />ISSUE/CONCERN: Requested a traffic analysis/impact study. <br />RESPONSE: Completed; however, the sampling was 11 hours (0700-1800 hours) on January <br />22, 2004, and accounts for McCabe Rd. from the East and West, and Northbound SH 146 <br />Mainlane. This sample is relatively light since it appears to have been conducted only once. <br />Most surveys take multiple days (at least two). The study gives a cursory mention of other <br />developments but generalizes a 5% annual growth and takes that factor into the estimates for <br />the survey. That rate is average for the HGAC region although local estimates can be much <br />higher. The growth, according to the study, will not have a significant impact on the <br />development or the traffic flow in relation to level-of-service ratings because of the limited <br />access between McCabe Road and SH 146 now and in the future. With Level-Of-Service <br />(LOS) A being the best, LOS D being acceptable and LOS F being severely congested <br />service, the study cites that the development, given the parameters stated above, will rate no <br />worse than LOS B and concludes no adverse impact for this development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.