Laserfiche WebLink
Special Conditional Use Permi&U04-013 • <br />Planning and Zoning Commission <br />September 16, 2004 - <br />Location of Pro osed Development <br />1200 Block of McCabe -Road - <br />Legal Description <br />TRS 8, - 8A, 5F-1, 49A, & 9B; W. P. Harris <br />Survey,A-30. <br />Applicant <br />Robert Burchfield <br />Present ZoningPlanned <br />Unit Development '(PUD) <br />Project Name <br />Preserve at Taylor Bayou <br />Acreage' <br />28.43 acres, 77.5 acres (nature preserve) . <br />Surrounding Zoning <br />North.. Planned Unit Development. (PUD) . <br />East Low Density Residential (R-1) <br />South Low Density Residential (R-1) .. • <br />West. Planned Unit Development (PUD <br />Land Use <br />Residential r <br />Activity Proposed <br />Multi -Family, .. Residential, : Townhomes and <br />Nature Preserve .. <br />Summary: <br />• The subject property is located at the southeast comer of McCabe Road at.SH 146 near Taylor Bayou: <br />• . The said parcel of land consists of 28.43 acres.(PUD) out of 107 acres tract located south of McCabe Road <br />and the easterly right-of-way line of State Highway 146. <br />• The previous submittal was for 418 apartmentunits and was denied .by P&Z and City Council. <br />• The applicant is now proposing multi -family and townhome development in two phases. Corresponding <br />densities now meet densities allowed by the strict compliance of Chapter 106. The Commission may vary <br />from strict compliance within a.PUD. <br />•. . The -current proposal still intends to dedicate a 77.52(+/-) acre nature preserve:: <br />• _ :Tlie plan also shows two points of entrance/exit along McCabe Road. <br />!._• The applicant has stated that funding for PUD portion of the _said project is in place. The funding for <br />trails will be determined once a decision is made about who "owns" the NaturePreserve: . <br />- - , � =. ;,:���•. ;..The Nature -Preserve concept -requires more details including the.layout, trail_materials^and stricture, (e,g. l:; <br />Y decks, benches, etc.), estimated yearly maintenance costs and ':fornial dedtcahon•'dnsti'ument before ' > _ <br />constdering City acceptance. Harris County has expressed an inferest'in the`Preserve dedication. <br />A new.lift•station :is proposed near .the east. end,of the. proper y and McCabe Road in accordance with the. R <br />City's sanitary sewer master plan for this area. Army Corps of Engineers has -issued a•prelunmary opinion. <br />: 4- .The Environmental Assessment. and Traffic Impact Analysis studies have been completed for, the said <br />project.:'. : <br />Recommendation: <br />Based on the above analysis,.staffbelieves that the current submittal has merit. We recommend approval of the Special - <br />Conditional Use permit and General Plan. Staff will conduct further coordination in the area of utility planning and the <br />preserve dedication. In addition, we solicit the Commission's input while considering the following preliminary <br />conditions: <br />1. An overall density of the multi -family -(apartments) and townhomes shall not exceed 14 and 10.. <br />dwelling units per acre respectively. <br />2. The nature preserve "conservation easement" ownership and responsibility for its maintenance must be <br />established. The City requirement for compensating' open land will apply: The City must approve the <br />conservancy dedication instrument ` <br />3. The applicant/developer shall be responsible for the maintenance of the 77.52. Conservation Easement until <br />transfer of ownership and/or responsibility: <br />4. The public shall have access to the conservation area using trails that are constructed and maintained <br />by the applicant/developer. City intends to control the hours of operation. <br />5. Provide an irrigation system to ensure that all landscaping and screening is properly maintained by the <br />owner/developer. <br />6. If approved; the design of the detention will.be reviewed by staff to ensure consistency with ordinances <br />and the Taylor Bayou Watershed Plan.. Permits with Army Corps of Engineers and County Flood <br />Control must be'presented to the City. . <br />7. . The developer shall contribute to traffic calming devices/tools (e.g. right turn lane) to ensure that <br />traffic congestion does occur.as-a result of his.project. <br />8.:. The applicant:must secure a maintenance bond, according to the.City's multi -family provisions, or' <br />seek an approved alternate showing evidence of bonding insurance"or participate in a. "reserve fund <br />