Laserfiche WebLink
Preserve at <br />Taylor Bayou <br />September 16, .2004 <br />Page 6 of 7 <br />1. <br />An overall density of the multi -family (apartments) and town homes shall not exceed : <br />14 and 10 dwelling units per acre respectively.. . <br />2. .:: <br />The nature preserve "conservation easement" ownership and. responsibility for . its <br />maintenance must. .be established.: -The City requirement. for -compensating open land, <br />willapply. The City must. approve -the conservancy dedication instrument. <br />: .3. <br />The applicant/developer shall be responsible for the maintenance of the 77.52 <br />Conservation Easement until transfer of ownership and/or responsibility: <br />4. <br />'The public shall have access to the conservation area using trails that are constructed <br />and maintained by the applicant/developer.. City. intends to control the hours of <br />operation. <br />5: <br />Provide an irrigation system to ensure that all landscaping and screening. is properly . <br />maintained by the .owner/developer. <br />6. <br />If approved,'the design of the detention will be reviewed by staffto.en§ure <br />consistency with ordinances and the Taylor Bayou Watershed Plan.". Permits with <br />Army Corps of Engineers and .County.Flood Control must be presented to the City. <br />- 7. <br />The developer shall contribute to traffic calming devices/tools (e.g..right turn lane) to . <br />- . :-• <br />ensure -.that. -traffic congestion does occur as a'result of his project. <br />�8 <br />`The propose -complex=must provide an area designated for. accomm_ odation of school,.- <br />,... _ �, • _ : - '- ti :�'; <br />buses°,'pick-up/drop:-of .sites .as. per LPISD's design standards_ <br />' 'The applicant must secure a maintenance bond, according to the City's multi-famiiy's= � • <br />,..precisions,-or.seek <br />as.n. approved alternate showing evidence of -bonding insurance or.:.:.: , , <br />P. pa eei ate.in'ta`reserve�fiind mechanism" that-establishes:an account.far•the sole, <br />P <br />- _.:purpose:.of maintenance to theproject. This fund is for the lifetime of the. project.: <br />:The:owner/applicant-mdA-construct-a lift station and dedicate.an.easement to'the City..:,;., <br />at Taylor Bayou and. McCabe. for the City's future regional lift station..- <br />-1 l :" <br />The applicant must provide proof of funding allocation. <br />. 12. <br />The applicant must provide a covenant that the-multi-family.portion of the project . ' - _ <br />remains on the City's-tax'rolls. <br />. 13. <br />-A letter from Army Corps of Engineers for approval of the:lift station must be-'. <br />submitted prior to the building permit. <br />14.. <br />Utility. Plan must be approved by City Staff. <br />.15..: <br />Proposed sidewalks must be annotated on the General Plan. <br />16. - <br />All utilities should be planned: for underground routing. <br />17. <br />The applicant must provide a covenant for maintenance of common areas: <br />18. <br />The General Plan must be updated to complywith the City of La Porte's General Plan.. . <br />Checklist. <br />19. <br />The Developer shall comply with all other applicable laws and ordinances of the City - <br />= <br />of La Porte -and the State of Texas. <br />