My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-19-2004 Regular Meeting, Public Hearing, and Workshop Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2004
>
08-19-2004 Regular Meeting, Public Hearing, and Workshop Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 3:12:37 PM
Creation date
7/31/2025 11:29:39 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
8/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FROM Northrup Associates In PHONE NO• :.713 463'5039 Aug. 03.2004 03:16PM P13 <br />NOTICE TO PMTITTEES :. . . <br />Department of the Army Permits for Work:in Navigable Waters require attention to <br />administration and policies which are often misunderstood or disregarded. To avoid <br />possible misinterpretations and to expedite procedures, perniitpost-authorization , <br />requireniente and-pertment infomafion are outlined as foilowc <br />1. Permits remain in effect until revoked, relinquished, or the structures are removed.' <br />An exten::ioa of time for comflletion.af structures or worts may be granted provided that a <br />publlci .notice is issued and that evidence is furnished of the bona Me intention of the <br />permittee to cam ste the v arlc within a reasonable time. If Rork or structures are not . <br />completed within the time provided in the penult, it is the Qetmittee's f9.00as.bi1= to <br />request at► extension of time at lent 4 moaths before the expiratiou.date. <br />2. Maintenance of authorized completed structures may be done at any time without <br />extending the completion period. It ia, however; required that the •District Engineer be <br />notified prior to commencement of maiatenaizce. <br />3. SPEOL&L REGULATIONS GOVERN MAINTENANCE WORK INVOLVING <br />DIMMING OR FILL.- -This maintenance is not authorized bar the original permit and <br />specific prior approval is required before such work is cba=enmd.in navigable wateis. <br />' 'Your request for auti�orization shouln be submitted in time for public notice raquiretaents <br />and.soosdiaaCion with other agencies:.. <br />t_'� �ac4-�: _%'. . k' , ; • ', S "a►nlrsils Of Strt]ttQre6 or work wverad b . a '.t is transferred; _the:DtZiCt _- ,r; r '. .• <br />ngm <br />"er.e aiiisti-be notified im�mediatel The aotificatioal-will.provide <br />peraiYitrespofisibilitfes eaa'be changed to the now - -- <br />dx�ner:o:"assignee: .-� <br />.._ :S: PermitteeF lure reminded that themust bq <br />:. : of ies or.pmmncement Area Engnorh, soo <br />teofconstructionos <br />and imstiedinteT u ari 4fi�'. _ "- <br />_ Y pipelines across: Federal prof act channels are covered by ngineer . <br />eiiould'be infoimed of the date ci�e pipelines are to be placea.inAime for him to sirange for- _ <br />an inspector. to be piesen_t. <br />6. All material changes in location or plans must be submitted promptly to the Dishict <br />grgin oer for approval oefore construction is begun. <br />7. Permits should not be considered as an approval of design features of any <br />structure authorized or as izziplication that such structure is edegcare for the purpose <br />• iateaded. . . _ <br />DMICT DIMMER <br />GALVESTON DISTRICT <br />CORPS OF ENQINEERS <br />SWG FL 279 <br />24 April 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.