My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-19-2004 Regular Meeting, Public Hearing, and Workshop Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2004
>
08-19-2004 Regular Meeting, Public Hearing, and Workshop Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 3:12:37 PM
Creation date
7/31/2025 11:29:39 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
8/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF LA PORTE PLANNING DEPARTMENT <br />16. <br />04 604 W. Fairmont Parkway, La Porte, TX 77571 <br />M www.ci.la-oorte.tx.us <br />Phone: (2811471-50201 Fax (281) 471-7168 <br />rexp►e <br />MEMORANDUM FOR RECORD <br />MARCH 29, 2004 <br />TO: Director of Planning . <br />FROM:. City Planner . <br />Re: Developer Responses to City_of La Porte's Requests, The Preserve at Taylor Bayou. <br />To date, the City of La Porte has received the following responses to issues and concerns from <br />- : the Developers and/or Engineers working on "The Preserve at Taylor_Bayou".'Project: <br />:ISSUE/CONCERN: New application.foX a_sSpteeial.;Copditional uge Permit (SCUP)": -•- <br />based upon current zoning.. :..... <br />T•c :'`t:'.�`_:.' _ .. _ .. '_.=-e;` :riykWi;. i•:Pz.,':;:5i:; `: • i�a3: ;�.a: ,�.. � :�a:.• :f ::-. .. <br />RESPONSE: Completed. : s , _ - = :.•.� - . .� :. _ . <br />_ .. <br />ISSUE/CONCERN: New general plan to be filed identifying Location of lift station and <br />easements; Wetlands; SW Bell Station; Trails; Public Parkland. <br />RESPONSE: Completed. . It should ' be noted that : the. location. of the Lift -Station must. be <br />verified (see discussion on page 2 this memorandum). <br />ISSUE/CONCERN: Requested a traffic analysis/impact study.. <br />RESPONSE:. Completed; however, .the`sampling was 11 hours (0700-1800 hours), on January <br />22, 2004, ,and accounts for McCabe ;Rd. from the,East. and West; and Northbound SH 146• <br />Mainlane.. "This sample is relatively :light since it appears to have. been conducted only. once. <br />Most surveys take multiple days (at least two). The study gives a cursory -mention of other <br />developments but generalizes a 5"/0.annuid growth and takes that factor into the -estimates for_ <br />the survey. That rate is average for the HGAC ,region although local . estimates can, be much . ' <br />higher. The growth; according. to the study,. will _not have a significant. impact - on the . <br />development or.the'traffic.flow'in-relation to level -of -service ratings because of.the limited <br />access between McCabe Road and: SH -146, now and 'in the. future. With Level -;Of -Service <br />(LOS) A being ,the best, LOS 'D • being acceptable and LOS T being. severely congested <br />service, the study Bites that the: development, given the parameters stated above, will rate no <br />worse than LOS B and concludes no adverse impact for this developmerit._ <br />,.,t...,... .s+-.+.....,. _, .....,.r>....r. .,•:..v_ a- .r.. .n ... r ... ,..;,: c:....._:.,,.,:..v:.v._:.-��.��.__ xr.�e..:.,.r.:... ,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.