My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-20-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2005
>
01-20-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
7/31/2025 11:29:45 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
1/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />Rezone Request #R OS-001 <br />P&Z Feb 17, 2005 <br />Page 2 of 2 <br />• <br />Transportation -Both tracts gain access using Farrington Boulevard, a <br />minor arterial with 100' ROW, which provides access to Fairmont Parkway <br />and Spencer Highway. However, Farrington Boulevard median cut and its <br />alignment with the access points of the proposed development will be <br />reviewed carefully at the time of plat submittal. Fairmont Parkway, asemi- <br />controlled access highway with 250' ROW, may accommodate the traffic <br />generated by this development. <br />Parks and Recreation -The nearest park facility is in Fairmont Park <br />Central Section 2 along Farrington Boulevard at Collingswood. This facility <br />serves the parks and recreation needs of several neighborhoods within a 1 to <br />2 mile radius. At the time of platting, attention should be given to pedestrian <br />connectivity. The subject tracts would provide the needed access to connect <br />Big Island Slough to the Exxon-Mobil Pipeline as mentioned in the City's <br />Bicycle and Pedestrian Implementation Plan. <br />Utilities -Sufficient water and sanitary sewer facilities exist in the area. <br />The detailed analysis will occur when subdivision plats are submitted. In <br />addition, the developer must provide any structures or improvements <br />necessary to serve future development. Storm water drainage and detention <br />is also an issue that will be carefully reviewed as the project develops. Staff <br />recommends on-site detention for the proposed development. <br />Residential Development -The intent of the Comprehensive Plan is to <br />provide for attractive low-density residential neighborhoods. The <br />neighborhood protection standards applicable to this project may include <br />physical screening, increased setbacks, and use of open space buffers. When <br />reviewing the subdivision plat, the Commission may consider additional <br />buffering between land uses, e.g. adjoining commercial uses along Fairmont <br />Parkway. <br />Conclusion: At this time, Staff recommends that the Planning and Zoning Commission <br />approve this rezone request, as it represents the highest and best use of the <br />property. Furthermore, the request supports the goals and objectives of the <br />Comprehensive .Plan. <br />Actions available to the Commission are as follows: <br />• Recommend approval of the zone change from GC to R-1, as <br />requested, <br />• Recommend denial of the zone change from GC to R-1, and <br />• Continue the public hearing until next meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.