Laserfiche WebLink
• <br />Rezone Request #R OS-001 <br />P&Z Feb 17, 2005 <br />Page 2 of 2 <br />• <br />Transportation -Both tracts gain access using Farrington Boulevard, a <br />minor arterial with 100' ROW, which provides access to Fairmont Parkway <br />and Spencer Highway. However, Farrington Boulevard median cut and its <br />alignment with the access points of the proposed development will be <br />reviewed carefully at the time of plat submittal. Fairmont Parkway, asemi- <br />controlled access highway with 250' ROW, may accommodate the traffic <br />generated by this development. <br />Parks and Recreation -The nearest park facility is in Fairmont Park <br />Central Section 2 along Farrington Boulevard at Collingswood. This facility <br />serves the parks and recreation needs of several neighborhoods within a 1 to <br />2 mile radius. At the time of platting, attention should be given to pedestrian <br />connectivity. The subject tracts would provide the needed access to connect <br />Big Island Slough to the Exxon-Mobil Pipeline as mentioned in the City's <br />Bicycle and Pedestrian Implementation Plan. <br />Utilities -Sufficient water and sanitary sewer facilities exist in the area. <br />The detailed analysis will occur when subdivision plats are submitted. In <br />addition, the developer must provide any structures or improvements <br />necessary to serve future development. Storm water drainage and detention <br />is also an issue that will be carefully reviewed as the project develops. Staff <br />recommends on-site detention for the proposed development. <br />Residential Development -The intent of the Comprehensive Plan is to <br />provide for attractive low-density residential neighborhoods. The <br />neighborhood protection standards applicable to this project may include <br />physical screening, increased setbacks, and use of open space buffers. When <br />reviewing the subdivision plat, the Commission may consider additional <br />buffering between land uses, e.g. adjoining commercial uses along Fairmont <br />Parkway. <br />Conclusion: At this time, Staff recommends that the Planning and Zoning Commission <br />approve this rezone request, as it represents the highest and best use of the <br />property. Furthermore, the request supports the goals and objectives of the <br />Comprehensive .Plan. <br />Actions available to the Commission are as follows: <br />• Recommend approval of the zone change from GC to R-1, as <br />requested, <br />• Recommend denial of the zone change from GC to R-1, and <br />• Continue the public hearing until next meeting. <br />