My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-17-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2005
>
11-17-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:57:02 PM
Creation date
7/31/2025 11:29:59 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
11/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preserve at Taylor Bayou - A Plat <br />Planning and Zoning Commission <br />December 15, 2005 <br />Location of Proposed Development <br />1200 Block of McCabe Road <br />Legal Description <br />TRS 8, 8A, 5F-1, 49, 49A, & 9B; W. P. Harris <br />Survey, A-30. <br />Applicant <br />Robert Burchfield <br />Present Zoning <br />Planned Unit Development PUD <br />Project Name <br />Preserve at Taylor Bayou <br />Acreage <br />15.98 acres (residential), 1.32 acres (comm.) <br />Surrounding Zoning <br />North Planned Unit Development (PUD) <br />East Low Density Residential (R-1) <br />South Low Density Residential (R-1) <br />West Planned Unit Development PUD <br />Land Use Map <br />Residential <br />Activity Proposed <br />Multi-FamilyResidential, Townhomes, and <br />Commercial/retail <br />Summary: <br />• This project has an approved General Plan and SCUP. A Preliminary Plat for this subdivision was approved <br />during the Commission's September 15, 2005, meeting. The current submittal is a Final Plat for Phase I of <br />this development consisting of multi -family residential, townhomes, and commercial/retail component of <br />the Preserve at Taylor Bayou. <br />• The subject property is located at the southeast corner of McCabe Road at SH 146 near Taylor Bayou. <br />• The property being platted consists of approx.16 acres out of 107 acres tract located south of McCabe Road <br />and the easterly right-of-way line of State Highway 146. <br />• The proposed uses are: multi -family (180 apartments), townhomes (8 buildings), and commercial/retail. <br />• The plat shows two points of entrance/exit along McCabe Road. <br />• The applicant has stated that funding for the said project is in place. <br />• Water distribution facilities are available along south of McCabe Road, but sanitary sewer is not readily <br />available to the property. <br />• It is anticipated that the proposed development will be connected to a new trunk main to be constructed <br />going north through the proposed "Lakes at Fairmont Greens" subdivision for sanitary sewer. <br />• The Environmental Assessment and Traffic Impact Analysis studies have been completed for the said <br />project. <br />Recommendation: <br />Based on the above analysis, staff believes the project contains potential. The developer of the Preserve at <br />Taylor Bayou and the developers of the proposed "Lakes at Fairmont Greens" subdivision will need to <br />coordinate with one another in the area of utility planning. A positive step needs to be taken for the preserve <br />dedication. Staff has reviewed the final plat and submitted comments to the developer/Engineer. Some <br />outstanding issues remain, and should the Commission wish to approve the Final Plat in its present format, <br />Staff suggests the following conditions: <br />• The Final Plat and Construction drawings shall indicate all infrastructure and site drainage improvements <br />to ensure adequate capacity and proper site drainage. <br />• The developer shall be responsible for installation of sidewalks along both sides of all right-of-ways within <br />the complex, as well as the east and west sides along McCabe Road towards the end of the subdivision <br />line. <br />• According to the City's multi -family provisions, the developer must secure a maintenance bond or seek <br />an approved alternative showing evidence of bonding insurance. If neither of the above options is <br />exercised, the developer must participate in a "reserve fund mechanism," which establishes an account <br />for the sole purpose of maintenance to the apartment project. This fund shall exist for the lifetime of <br />the project. <br />• Detention pond ownership and maintenance thereof by the Homeowner's Association shall be stated <br />on the Final Plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.