My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-17-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2005
>
11-17-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:57:02 PM
Creation date
7/31/2025 11:29:59 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
11/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
v <br />Zone Change <br />P & Z (12/15/05) <br />Page 2 of 3 <br />The current land use plan designates the area as intended for commercial use, <br />and the City has been consistent in accommodating General Commercial <br />(GC) uses along the major roads within the City limits. However, the <br />following aspects should be considered for granting a rezoning request: <br />• Ability of infrastructure to support the permitted use. <br />• Impact on the value and practicality of the surrounding land uses. <br />• Conformance of a zoning request with the land use plan. <br />• Character of the surrounding and adjacent areas. <br />• Suitability of the property for the uses which would be permissible, <br />considering density, access and circulation. <br />• The extent to which the proposed use designation would adversely affect <br />the capacity or safety of that portion of the road. <br />• The extent to which the proposed use designation would create excessive <br />air pollution, water pollution, noise pollution, or other environmental <br />harm to adjacent properties. <br />• The gain, if any, to the public health, safety, and welfare of the City. <br />Transportation — The tracts in question will have access along Canada <br />Road running north and south between Spencer Highway and Fairmont <br />parkway. The design of Canada Road improvement was completed in 2004. <br />The rights -of -way for the proposed road improvement were acquired and <br />the utilities to serve this general area were designed given special <br />consideration to the pipeline adjustments and power lines relocation. <br />The bidding and construction of the road and utilities started earlier this <br />year. The Canada Road improvement project was completed in November, <br />2005. Traffic signalization work is under progress at this time, and it is <br />estimated that it will be few weeks to complete this project. <br />Canada Road, an arterial with a 100' ROW, may accommodate the <br />additional traffic generated by future developments. In addition, Fairmont <br />Parkway, a controlled access highway with a 250' R.O.W. may also <br />accommodate additional traffic generated by this development. <br />Utilities — Due to the success of the Canada Road improvement project, <br />infrastructure is in place for the anticipated developments at this <br />intersection. Storm water drainage will be reviewed carefully with the site <br />development plan submittal for proposed development. <br />Economic Development - One of the intentions of the Comprehensive Plan <br />is to encourage new and sustained investment in the City as the basis of a <br />successful redevelopment strategy. This may be achieved by encouraging in - <br />fill development within existing infrastructure service areas. Commercial, <br />retail, and service activities should be clustered throughout the City and be <br />
The URL can be used to link to this page
Your browser does not support the video tag.