Laserfiche WebLink
<br />ARTICLE III. RESTRICTIVE COVENANTS <br /> <br />3.1 Development of Restrictive Covenants. Owner-Developer has developed a Draft <br />Declaration of Restrictive Covenants for Port Crossing, which are attached to this Agreement as <br />Exhibit "D". These protective covenants and deed restrictions will apply to and be binding upon <br />the Tract, and shall be in form substantially similar to Exhibit "D". The covenants and deed <br />restrictions shall be approved by the City and shall be recorded concurrently with each recorded <br />plat. <br /> <br />ARTICLE IV. TERMINATION <br /> <br />4.1 Term. This Agreement shall have a term commencing on the date first written above, <br />and continuing until the sooner to occur of (i) the date in which all portions of the Tract have <br />been platted and developed (with construction of all streets and utilities on the Tract as reflected <br />by the plats completed or installed and financed by the Owner-Developer), or (ii) <br /> <br />Failure of Owner-Developer to begin construction in accordance with the Special Conditional <br />Use Permit within one year after issuance of said permit, or as scheduled under the terms of the <br />Special Conditional Use Permit, shall terminate this Agreement. Owner-Developer may, before <br />the expiration of one year, request an extension of time from the Planning and Zoning <br />Commission, in the event that construction has not started in accordance with the Special <br />Conditional Use Permit. <br /> <br />ARTICLE V. OPEN SPACE/TRAIL, BUFFERING AND BEAUTIFICATION <br /> <br />5.1 Open Space/Pedestrian Trail System. The Owner-Developer shall provide common <br />open space as shown in Comprehensive Plan and the General Plan, including any required <br />portion of planned City trail system within the project consisting of public sidewalks within the <br />rights-of-way noted on the Plat on at least one side of each street, together with landscaping <br />adjacent to such sidewalks pursuant to the landscape plan approved by the City. Owner- <br />Developer also will cooperate with any additional trail system plan on property dedicated to the <br />City in fee or as an easement within the drainage easement and/or detention pond/drainage <br />system shown on the General Plan. <br /> <br />It is recognized that, until the final design of the detention pond/drainage system is approved, the <br />exact location and dimensions of these facilities is unknown. When the final design is approved <br />the City will evaluate the potential for use of these areas as public recreation amenities. <br /> <br />At that time and with mutual consent, the City may elect to accept these facilities either in <br />easement or fee. The initial development of the detention pond/drainage system and perimeter <br />landscaping of these facilities shall be the responsibility of the Owner - Developer. The <br />responsibility of ongoing maintenance of these facilities shall also be determined after reviewing <br />the final design. <br /> <br />H-Development Agreement.doc <br /> <br />- 3 - <br />