Laserfiche WebLink
<br />Retreat at Bay Forest (N&S) - Re-p1ats <br />3/15/07 - P & Z Meeting <br />Page 3 of4 <br /> <br />Utilities - There is sufficient water service available to serve these proposed <br />developments. Originally, this area was a part of the potentially overloaded <br />sewer system as per South La Porte Wastewater Report. Later, improvement <br />of the wastewater system around Texas Avenue and closing of the Vista <br />Baywood Apartments provided some relief. In addition, an upgrade of the <br />system from Broadway to McCabe Road will provide further relief to the <br />sanitary sewer system. The developer is responsible for providing all on-site <br />infrastructure or improvements to accommodate the subdivision's water and <br />sanitary sewer needs. The design and construction of all water and sewer <br />systems shall be in conformance with the Public Improvement Criteria <br />Manual (PICM). <br /> <br />Drainage - The proposed subdivisions are located in the Taylor Bayou <br />Watershed, therefore, detention is required per the City of La Porte's <br />criteria. North and South sections are designed so that all storm drainage <br />flows directly into the detention basin located in the south section adjacent <br />to Harris County Flood Control District facility. Future street projection <br />through the North Section will provide further relief to the drainage <br />system. The detention basin's size and capacity has been reviewed on the <br />construction drawings to ensure that it adequately serves the proposed <br />developments without burdening the existing system or adverse impact to <br />the Golf Course. All the necessary easements required for proper <br />drainage, including storm water inlets have been noted on the plats. <br /> <br />Fencing - The proposed subdivisions abut the Golf Course on the West. <br />Design of the fence must be approved by the City. Fence standards (6' <br />high wrought iron fence adjacent to the Golf Course) are stated in the <br />protective covenants or deed restrictions. Maintenance/repair costs by the <br />homeowner association must be stated in the document to be submitted <br />with the plats. <br /> <br />Conclusion and <br />Recommendation: <br /> <br />The Final Plats are in accordance with the City's Development Ordinance. <br />Staff recommends approval of the Final Plats. The following items need to <br />be addressed prior to the recordation ofthe Plats: <br /> <br />. All construction improvements are complete at site. <br /> <br />. Fencing specifications and standards shall be stated in the CCRs and <br />must be approved by the City. <br /> <br />. Sidewalks shall be installed along both sides of all public streets and <br />along south side of South "S" Street up to South Broadway. <br /> <br />. Payment of $244.36 shall be made to the City for street sign installation. <br /> <br />. Payments of $2,530.00 and $1,896.36 shall be made to the City for <br />streetlights installation and I-year service cost respectively. <br />