My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-15-07 Regular Meeting, Public Hearing and Workshop of the LP Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2007
>
02-15-07 Regular Meeting, Public Hearing and Workshop of the LP Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
7/31/2025 11:30:19 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
2/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Lakes at Fairmont Greens, Section 9 - Preliminary Plat <br />Planning and Zoning Commission <br />March 15,2007 <br /> <br /> <br />Present Zonin <br />Project Name <br /> <br />Acreage <br />Surrounding Zoning <br /> <br />2000 Block of State Hi hwa 146 <br />TR A Parcel 10; W. P. Harris Survey, A-30, La <br />Porte, Harris Count , Texas. <br />La Porte 65 Ltd. (Arete Real Estate & <br />Develo ment <br />Planned Unit Develo ment PUD <br />Lakes at Fairmont Greens, Section 9 <br />20.119 acres <br />North Planned Unit Development <br />East Planned Unit Development <br />South Planned Unit Development <br />West Planned Unit Develo ment <br />Residential <br />Sin le-Famil residential 0 lot line <br /> <br /> <br />Applicant <br /> <br /> <br /> <br />Summary: <br />· The Lakes at Fairmont Greens has an approved General Plan and SCUP. The current submittal is a <br />Preliminary Plat for Section 9 of this development. <br />· The subject property is located at the southeast of State Highway 146 and McCabe Road. <br />· The applicant is proposing 108 single-family residential zero or special lot line for this section. <br />Corresponding density meets densities allowed by the strict compliance of Chapter 106 (Zoning). <br />· The plan shows two points of entrance/exit, however, one is questionable and requires approval by TxDOT <br />· The water is available along easterly right-of-way line of SH146. Sanitary sewer is not readily available to <br />the property but is under construction. <br />· A new lift station is proposed near the southeast end of the property adjacent to Taylor Bayou. Extension <br />of the southeast sanitary sewer construction of trunk main and lift station facilities shall be constructed <br />through a Developer's Agreement in accordance with the City's sanitary sewer master plan for the <br />Southeast of La Porte. The proposed development will be connected to the new trunk main going north for <br />sanitary sewer. <br />· The layout for drainage and detention is in accordance with the Taylor Bayou Watershed Plan and through <br />conveyance is directly outfalling into the Taylor Bayou. <br />· Landscape, utilities and soundwall reserves are located along SH 146. <br />· Previously, the City disapproved the similar layout plan for the subject property submitted by John Hettig. <br /> <br />Recommendation: <br /> <br />Staff reviewed the preliminary plat and found it to be partially in accordance with the development ordinance of <br />the City. Should the Commission wish to approve the Preliminary Plat in its present format, staff suggests the <br />following considerations prior to the Final Plat: <br /> <br />· As per approved SCUP, land use "single-family special or zero lot line" must be approved by the City. <br />· For emergency purposes, relocate 2nd point of entry to the subdivision along McCabe Road not SH146. <br />· Building setbacks of 15' needs to be approved in lieu of20'. <br />. Lot area is less than the required 4500' for the zero lot line. <br />. Utility schematics are under review by the City. <br />· Require approval of Harris County for the drainage easement. <br />· 20' private alley and sanitary sewer easement, IS' building setback including 10' waterline easement will <br />be difficult to maintain public services. <br />· Building design standards need to be submitted to the City for review. <br />· Protective covenants and restrictions for this subdivision need to be submitted for the City Attorney's <br />review and approval. <br />· Parkland fees in compliance with the Development Ordinance 1444-G dated 4-10-2006 shall be <br />applicable. <br /> <br />. r', l!n"'~4A A <br />"'!,rtd"T,ttr . <br />
The URL can be used to link to this page
Your browser does not support the video tag.