My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-18-08 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2008
>
12-18-08 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:56:03 PM
Creation date
7/31/2025 11:30:41 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
12/18/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of La Porte - Main Street Program DRAFT as approved by MSAB on 11-13-08 Enhancement Grant <br />8. Grant applications and awards can be made in any of the reimbursable activities listed above and may <br />be combined for any single property or project. An applicant is defined as an owner, tenant, or <br />combination thereof occupying an eligible property within the MSADD. A single owner of multiple <br />properties may apply for grant funds for each property owned but match must be for no less than <br />$2,500 and may not receive more than $25,000 per property in a three (3) year period of time. <br />GRANT APPLICATION PROCESS <br />1. Determine eligibility: Discuss project plans with the Main Street Coordinator. Coordinator will set <br />up a pre -development meeting with ° the MS DA16 for lod ce on your,�property. You may request <br />an appointment through the 'Main Street Coordinator firNee assist e iu selecting exterior color <br />schemes, sign designs, a <*a mg renderings of building fapad t o schedule an appointment <br />with the Texas Main Street Center's Architectural ,assistance` Program,, rcontact the Main Street <br />Development office at 2$1,470-5017. The MS DG' hould be a refrettee 46ide when making any <br />design impr€iveme o to properties in the N%in Street District. The N1S 1 are available from the <br />Main Street Development office at 004 W. Fairmont Nrkway, La Porte, TX 770J, <br />2. Fill out MS EG 4pplication ferric gird sign the agreement fb* All Ott implication packages must <br />include: <br />• A Main Street Design Cortifieate <br />• A sole drswing by. the pmjo4 architect des%gn.pmfe nal of ai<i proposed grant work. <br />• Include sampl such as oor sampols ofittrt, isbffcs scces, sign material, etc. Provide <br />any additional items that will finable t1 MS:1A"P tci etrsioxt finished project. <br />• Itemized written fork*estiiates o aili^ojt `om fors or project architects. <br />Self -contracted work wi be rimbued " " , fuel legitimate expenses, excluding labor. <br />• Furnish photographs of the' buin4pphogrdphs <br />l be required to furnish <br />photographs of the bu►lding's exterior, the locations than are included as part of the <br />Application request and shall providafter the construction is completed, as a <br />condition of final grant reimbursement, <br />3. Return the completed app4ca on form with ali items listed above in *2 for each component of the <br />application to the Main Street Development office at 604 W. Fairmont Parkway. <br />4. The approval process includes, but is not limited to the following: <br />(a) All projects must meet current building standards and codes, as well as building permit <br />requirements. <br />(b) The MS DART shall consider only Applications which have been properly and fully completed <br />and which contain all information required in the Application or requested. <br />(c) All construction bids submitted by an Applicant must be current and must be dated no earlier than <br />ninety (90) days prior to the Application request. Bids shall be submitted on the contractor's or <br />project architect's letterhead and shall contain the contractor's name, address, telephone number <br />and shall itemize the bid in a manner that allows the MS DART to determine the bid components <br />and authenticity of the bid. <br />(d) Applicants receiving approval by the MS DART shall commence construction described in the <br />Application within ninety (90) days from the date the grant is awarded. All Applicants must <br />complete the construction described in the Application within one (1) year from the date the grant <br />MS ADD = MS Architectural Design District MS DC = MS Design Certificate <br />MS DG = MS Design Guidelines MSD = MS District <br />MS DART = MS Design Assistance Review Team MS EG = MS Enhancement Grant <br />3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.