My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-20-09 Regular Meeting,Public Hearings,and Workshop Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2009
>
01-20-09 Regular Meeting,Public Hearings,and Workshop Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:56:12 PM
Creation date
7/31/2025 11:30:44 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
1/20/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of La Porte - Main Street Program P & Z, 2-19-09 <br />Enhancement Grant <br />MAIN STREET ENHANCEMENT GRANT <br />APPLICATION - AGREEMENT FORM <br />Please return your completed application, along with required attachments, to the Main Street Development <br />office at 604 W. Fairmont Parkway, 2818-470-5017. A Main Street Design Certificate is required before the <br />Permit Division, 281-470-5074, is able to grant you a permit. <br />I have met with the Main Street Design Review Assistance Team and fully understand the Main Street <br />Enhancement Grant procedures and details established. I intend to use these grant funds for the <br />renovation projects, as spelled out in the MS EG and application. I have not received, nor will I receive <br />insurance monies for this revitalization project, or I have disclosed all pertinent insurance information <br />needed. <br />I understand that if I am awarded a MS EG by the MS DART, any deviation from the approved project <br />may result in the partial or total withdrawal of the MS EG. If I am awarded a reimbursement grant for <br />fagade, awning, signage, beautification, or other approved work, alterations should not be made within <br />five (5) years from construction; otherwise, I may be required to reimburse the La Porte Development <br />Corporation immediately for the full amount of the MS EG. <br />Applicant's Signature <br />Date <br />Property/Building Owner Signature (f differentfrom above) <br />FOR CITY USE: <br />-------------------------------------------------------------------------------------------------------------------------- <br />Date <br />Recommendation <br />MS Design Assistant Review Team, Chairman Signature <br />Date <br />Recommendation <br />MS Design Assistant Review Team, Asst. Chairman Signature <br />Date <br />Recommendation <br />City Manager or Designee <br />Date <br />MS ADS = Main Street Architectural Design Standards <br />MS DG = MS Design Guidelines <br />MS DART = MS Design Assistance Review Team <br />MS DC = MS Design Certificate <br />MSD = MS District <br />MS EG = MS Enhancement Grant <br />10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.