My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-21-11 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
2000's
>
2011
>
04-21-11 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:32 AM
Creation date
7/31/2025 11:31:04 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
4/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
West A Street <br /> Concrete Pavement : <br /> Remove Existing Pavement 1442 SY $7.00 $10,095.56 <br /> Lime Stabilization 36 Ton $75.00 $2,704.17 <br /> Fly Ash Stabilization 14 Ton $145.00 $2,091.22 <br /> 10 Inch Rienforced Concrete Pavement 1442 SY $36.00 $51,920.00 <br /> Total $66,810.94 <br /> Aspahlt Pavement: <br /> Remove Existing Pavement 1442 SY $7.00 $10,095.56 <br /> Lime Stabilization 36 Ton $75.00 $2,704.17 <br /> Fly Ash Stabilization 14 Ton $145.00 $2,091.22 <br /> Limestone Base 811 Ton $30.00 $24,337.50 <br /> 1.5 Inch HMAC 105 Ton $75.00 $7,909.69 <br /> Subtotal $47,138,13 <br /> Maintenance (resurface every 7 years) 7 EA $7,909.69 $55,367.81 <br /> Total • - $102,505.94 <br /> West 17th Street <br /> Concrete Pavement : <br /> Remove Existing Pavement 1980 SY. $7.00 $13,860.00 <br /> Lime Stabilization 50 Ton $75.00 $3,712.50 <br /> Fly Ash Stabilization 20 Ton $145.00 $2,871.00 <br /> 10 Inch Rienforced Concrete Pavement 1980 SY $36.00 $71,280.00 <br /> Total $91,723.50 <br /> Aspahlt Pavement: <br /> Remove Existing Pavement 1980 SY $7.00 $13,860.00 <br /> Lime Stabilization 50 Ton $75.00 $3,712.50 <br /> Fly Ash Stabilization 20 Ton $145.00 $2,871.00 <br /> Limestone Base 1114 Ton $30.00 $33,412.50 <br /> 1.5 Inch HMAC 145 Ton $75.00 $10,859.06 <br /> Subtotal $64,715.06 <br /> Maintenance (resurface every 7 years) 7 EA $10,859.06 $76,013.44 <br /> Total $140,728.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.