My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-03-06 Special Called Regular Meeting and Public Hearing
LaPorte
>
.Minutes
>
Wrecker Committee
>
2000's
>
2006
>
10-03-06 Special Called Regular Meeting and Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 3:02:31 PM
Creation date
7/31/2025 11:32:05 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Wrecker Committee
Meeting Doc Type
Minutes
Date
10/3/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LA PORTE CODE <br />Section <br />Description Amount this Code <br />Division 2. Owner's Permit <br />(a) Owner's permit application fee .......................... <br />50.00 <br />78-68(c) <br />(b) Annual permit fee ...................................... <br />100.00 <br />78-70(a) <br />Division 3. Driver's License <br />(a) Taxicab driver's license fee .............................. <br />10.00 <br />78-99 <br />Division 5. Regulation of Fees and Charges <br />(a) Taxicab rates and fares: <br />78-160 <br />(1) Initial fare ......................................... <br />1.50 <br />(2) Each additional one -fifth mile ....................... <br />0.30 <br />(3) Waiting time (hourly) ............................... <br />14.00 <br />Article III. Automobile Wreckers and Towing Vehicles <br />Division 3. Permits <br />Subdivision II. Towing Vehicle Permit <br />(a) Towing vehicle annual permit fee ........................ <br />50.00 <br />78-272(5) <br />(b) Towing vehicle permit transfer fee ....................... <br />25.00 <br />78-274(d) <br />Subdivision III. Auto Wrecker Permit <br />(a) Auto wrecker, permit application deposit fee .............. <br />150.00 <br />78-297(3) <br />(b) Auto wrecker operation permit fee ....................... <br />75.00 <br />78-300 <br />(c) Auto wrecker permit transfer fee ........................ <br />25.00 <br />78-302 <br />Division 4. Regulations <br />(a) Charge for normal tow .................................. <br />65.00 <br />78-329(a) <br />(b) Additional charges for labor not included in normal tow: <br />78-329(b) <br />(1) Ditch pull and/or rollover ........................... <br />20.00 <br />(2) Disengaging and removing drive shaft ............... <br />15.00 <br />(3) Change of tire ...................................... <br />10.00 <br />(c) Dollying of wrecked vehicle (inclusive of all over charges).. <br />105.00 <br />78-329(c) <br />(d) Maximum charge for tow ................................ <br />105.00 <br />78-329(d) <br />(e) Vehicle storage charge (daily) ............................ <br />15.00 <br />78-329(e) <br />Supp. No. 12 CDA:20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.