My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2013-3465 Right-of-Way Ordinance and Utility Permit Process
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2010's
>
2013
>
O-2013-3465 Right-of-Way Ordinance and Utility Permit Process
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 3:23:05 PM
Creation date
1/29/2013 4:49:30 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
1/28/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department at (281)471-9650. After business hours contact the La Porte Police Department <br />dispatch at (281)471-2141 or 911 and request a standby utility supervisor. <br />(5) A permit is not required for the following excavations: <br />(i) excavations made by or on behalf of a resident or owner of the <br />abutting property when the person has a city -approved site plan, <br />permit, or other approval specifically for the proposed excavation; <br />(ii) excavations made outside of the Street, Shoulder or curb for the <br />installation of a utility service drop. <br />(iii) the replacement in-kind of a single damaged utility pole or light <br />pole. <br />(6) In no case shall an exemption of the permit requirement relieve the <br />obligation of the Person excavating to provide sufficient notice for other existing utility locations <br />and markings prior to construction. <br />(7) In no case shall an exemption of the permit requirement constitute a <br />waiver any other provision of this ordinance. <br />(c) WHEN PERMITS ARE REQUIRED, the permit will be in the name of the <br />Person who will own the Facilities to be constructed. The permit application must be completed <br />and signed by a representative of the owner of the Facilities to be constructed. During the term <br />of the Permit the Utility shall be liable for the acts or omissions of any entity used by the Utility <br />when such entity is involved directly or indirectly in the construction and installation of the <br />Utility's Facilities to the same extent as if the acts or omissions of such entity were the acts or <br />omissions of the Utility and consistent with the Texas Local Government Code. <br />(d) Any person desiring a permit shall apply for such at least ten (10) working days <br />before the commencement of any work unless otherwise waived by the Director. <br />Notwithstanding this limitation, the Utility is encouraged to request a waiver from the Director if <br />the 10 -working day period may be burdensome to the end user requesting utility service or that <br />the end user might otherwise be without service. The Director will make every reasonable effort <br />not to delay the Utility of the Utility's ability to provide service to the end user. A permit is not <br />effective and valid until it is signed by the Director or his designated representative. <br />(e) The work for which a permit is issued shall be commenced within 45 days of the <br />effective date of the permit. In the event that special, exceptional or unusual circumstances <br />prevent the commencement of the work within the initial 45 -day period, the holder of the permit <br />may apply for a time extension before the expiration of the initial time period and the Director <br />may approve the same. If such work is not commenced with the initial time period or any <br />extension thereof, the permit shall be null and void. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.