Laserfiche WebLink
<br /> <br /> <br />MITTUTES - REGULAR MEEPING <br />LA PORTE CITY COhR~!QSSION -OCT. 2, 1959 <br />~ ~% . <br />7:00 P. M. <br />Regular meeting of the City Commission was called to order by Mayor H. P. <br />Pfeiffer, with the follaring present: Commissioners Brawn, Boyle, Lawler <br />and Osburn, Special Counsel Jno.S, Kiibler, w. A. Arthur, Supt., and City <br />Clerk Frank G. Baker. <br />Also present were J.C. Robinson with the Pittsburg Des Moines Steel Co., <br />w.E. Busse, with the Chicago Bridge & Iron Co., and Jerry Egger (Press). <br />A4i.nutes of the last meeting were read and approved. <br />Carried. <br /> <br /> <br />Mayor Pfeiffer asked that the bids on water Taxer be opened. The bids were <br />as follows <br />xAr~~ND IRON waRx~s <br />wA;RRE~t, PA. <br />LUMP SUM BASE BID: For construction of a 1100,000 gallon welded steel elevated <br />water storage tank as per plans and specifications: <br />SIXTY NINE THOUSAND NINE HUNDRED SIXTY DOLLARS ($ 69,960.00 <br />ALTERNATE BID: 'Far construction of a 500,000 gallon welded steel elevated <br />water storage tank as per plans and specifications: <br />LUT+Q' SUM EIGHTY TWO THOUSAND SIX HUNDRED THIRTY DOLLARS 082,630.00 ) <br />CHICAGO BRIDGE & IRON CO. <br />HOUSTON 2, TEXAS <br />LUMP SUM BASE BID: For construction of a 1100,000 gallon welded steel elevated <br />water storage tank as per plans and specifications: <br />LUMP SUM SIXTY THREE THOUSAND ONE IiUI~TDRED FIFfY DOLLARS 063,150.00 ) <br />ALTERNATE BID: For construction of a 5001000 gallon welded steel elevates <br />water storage tank as per plans aid specifications: <br />LUMP SUM SIXTY NINE THOUSAND SIGHT HU~TDRF.D THIRTY FIVE DOLLARS 069,835.00) <br />R. D. COLE MANUFACTURING CO. <br />NEWNAN, GA. <br />LUMP SUM BASE B7A: For construction of a !100,000 gallon welded steel elevated <br />water storage tank as per plans and specifications; <br />