Laserfiche WebLink
To The City of La Porte: <br />La Porte Boys Baseball Association <br />P.O. Box 113 <br />Welcome to the La Porte Boys Baseball Association <br />La Porte Boys Baseball is requesting a joint venture to make our baseball fields a safer place <br />for our youth to play baseball. Below you will find a quote for this project. We reached out to several <br />different companies and Ewing came back with the best deal. This project is needed and I feel should <br />have been in the plans on the original build of this facility. Proper mound, batter's box, and field <br />conditioner is important for the safety of our players. We are requesting that the City participate in this, <br />as an important joint venture project for both the Association and the City. Thank you for your <br />consideration. <br />Our Tax I.D. number is 760333362. <br />Sincerely, <br />Ti ODaniel <br />LPBBA President <br />Below is a Cost Breakdown per Field, and Totals for Material & Labor. <br />a. Field 3 & Field 4—Mustang $3,315.16 <br />b. Field 5 & Field 6 — Pony $3,315.16 <br />c. Field 7 & Field 8 — Bronco $3,316.16 <br />Clay Blocks per Field: $1.72 ea. X 304 (Pallet) _ $522.88 <br />Mound Clay per Field: <br />MVP Conditioner per Field: <br />Total Material Cost <br />Labor for Batter Box & Mound Build <br />Material & Labor, per Field: <br />Total Cost to Renovate Six Fields: <br />$13.56 ea. X 20 = $271.20 <br />$8.35 ea. X 10 = $83.50 <br />$847.58 <br />$810.00 <br />$1,657.58 <br />$1657.58 per field X 6 = $9,945.48 <br />Material costs and Labor costs are approximately equal. The Association would propose to pay for Materials for 6 fields @ <br />$5,085.48, if the City would pay for Labor costs of $4,860.00. By us buying the materials, we can take advantage of the <br />discount pricing available right now. <br />F <br />