My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1971-886
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1970's
>
1971
>
O-1971-886
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:30 PM
Creation date
7/19/2006 12:59:19 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
7/26/1971
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. .... <br />.:".~.. ~ ~ <br />.". 1...- <br />,.; .. L <br /> <br />. <br /> <br />. <br /> <br />'. <br /> <br />- "\ <br />~ I ,. <br /> <br />.. <br />i L <br /> <br />. <br /> <br />e <br /> <br />01 -=='\ <br /> <br />2. The State will reimburse the City for the cost of the electrical <br /> <br />energy used in operating the highway traffic signal(s) as measured by means of <br /> <br />a meter installed to serve the highway traffic signal(s), or as determined by <br /> <br />same method other than a meter which is mutually acceptable to all parties <br /> <br />concez;ned. <br /> <br />The State's payment for the electrical energy shall be based on the <br /> <br />minimum unit rate charged the City under the City's contract with the power <br /> <br />agency supplying electrical energy to the City. In the event the electrical <br /> <br />energy is supplied through a municipally owned electrical power generation <br /> <br />system, the State's payment for the electrical energy shall be based on the <br />I <br />minimum unit rate appearing in the City's commercial rate structure. <br /> <br />The City will forward the State two copies of its existing contract <br /> <br />with the power agency for electrical energy, and thereafter as the existing <br /> <br />or governing control is terminated and new contracts are executed. <br /> <br />All requests for payment for electrical energy shall be properly <br /> <br />certified and submitted by the City to the District Engineer of the State High- <br />77034 <br />way Department at p.o. Box 34458. Houston , Texsrf. Such requests for payment <br /> <br />shall be in accordance with forms prescribed by the State and shall be submitted <br /> <br />at not less than monthly intervals. The City will maintain a system of records <br /> <br />necessary to support and establish the eligibility of all claims for payment <br /> <br />under the terms of this contract. When requested by the State the City will <br /> <br />permit and assist in an audit by an auditor of the State Highway Department of <br /> <br />this record or any other records of the City which pertain to the costs of <br /> <br />electrical energy as covered by the terms of this agreement. <br /> <br />AGREEMENT (TRAFFIC SIGNAL - TYPE lA) <br /> <br />1-70-764, D-18T <br />File 18.126-2 <br /> <br />2,,' <br />
The URL can be used to link to this page
Your browser does not support the video tag.