My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1990-915-DD
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1990
>
O-1990-915-DD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:49 PM
Creation date
7/19/2006 4:49:33 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
2/26/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'\ .:. <br />. . <br /> <br />. <br /> <br />. <br /> <br />I ., ... " ] <br />~..,." i"'.I", <br />,j : """ ; I " \, I. ",- <br /> <br /> <br />AN AIR UaUIDE GROUP COMPANY <br /> <br />BIG THREE INDUSTRIAL GAS. INC, <br /> <br />February I, 1990 <br /> <br />The Honorable Norman L. Malone <br />Mayor of LaPorte - City Hall <br />P.O. Box IllS <br />LaPorte, Texas 77572-1115 <br /> <br />Dear Mayor Malone: <br /> <br />Big Three Industrial Gas, Inc. plans to construct a six inch <br />hydrogen pipeline beginning in Exxon's Friendswood "520" <br />Corridor, approximately 1000 feet south of Fairmont Parkway at <br />our LaPorte plant, continuing north into Exxon's Bayport <br />Bay town Corridor and crossing Fairmont Parkway, Spencer Highway, <br />North "D" Street, North "H" Street, North "L" Street, North "p" <br />Street, old LaPorte Road, State Highway 225, Strang Road and <br />Miller Cut-Off Road. The pipeline continues north to the <br />intersection of Exxon's Houston Ship Channel West Corridor, turns <br />west and continues across Miller Cut-Off Road to Dow Road, The <br />pipeline then turns south and parallels the east side of Dow Road <br />until terminating at the northeast corner of Dow Chemical's <br />LaPorte plant. Big Three plans to parallel the six inch hydrogen <br />pipeline with a twelve inch nitrogen pipeline beginning <br />approximately 430 feet south of North "H" Street and following <br />the above described routing of the six inch hydrogen pipeline to <br />the northeast corner of Dow Chemical's LaPorte plant. The <br />attached copy of a quad map indicates the beginning points, <br />ending points and routing of the six inch hydrogen and twelve <br />inch nitrogen pipelines. Also attached are pipe data sheets for <br />each of the two pipelines. <br /> <br />The following list of attached drawings represents all of the <br />road crossings for the six inch hydrogen and twelve inch nitrogen <br />pipelines. These drawings show the proposed plan and profile <br />views for each of the below listed road crossings. <br /> <br />3535 W T.',t.:I':h s~ ,HO;S:::!I1, TX 77008 PO, 80> 3047. f'ioL..s:o" TX 77253 P'1onc (7'318G!J,m:i:3 Ten;ofJler (71.:3: 868-:;3':5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.