Laserfiche WebLink
<br />e e <br />~ DAMES & MOORE <br />2550 NORTH LOOP WEST, SUITE 700, HOUSTON, TEXAS 77092 <br />(713) 688-4541 FAX: (713) 688-2314 <br /> <br />March 31, 1995 <br /> <br />Ms. Sue Lenes <br />City Secretary <br />City of La Porte <br />604 W. Fairmont Parkway <br />La Porte, Texas 77571 <br /> <br />VIA COURIER <br /> <br />Noltex L.L.C. Wastewater Pipeline <br />La Porte, Texas <br />City of La Porte <br />Roadway Crossine Packaees <br /> <br />Dear Ms. Lenes: <br /> <br />On behalf of Noltex L.L.C., please find attached for your review and approval three roadway <br />crossing packages (two sets each) in connection with three City of La Porte road crossings <br />(North H Street, North D Street, & North P Street) along the proposed Noltex L.L.C. <br />wastewater pipeline alignment located in La Porte, Texas. Included with each package are: <br /> <br />· Figure 1 - Noltex L.L.C. Area Location Map; <br /> <br />· Figure 2 - Noltex L.L.C. Wastewater Pipeline Alignment; and <br /> <br />· the plan & profile for the roadway crossing. <br /> <br />We will submit similar packages to Harris County for roadway crossing permits at Sens Road, <br />North L Street, Spencer Highway, and Fairmont Parkway. <br /> <br />The pipeline will convey neutralized process wastewater from the Noltex L.L.C. plant located <br />east of Sens Road at 12220 Strang Road to the Gulf Coast Waste Disposal Authority located <br />south of Fairmont Parkway. <br /> <br />As Figure 2 indicates, the Noltex pipeline will run within two pipeline corridors, the DuPont <br />Pipeline Corridor and the Exxon Pipeline Corridor System, respectively. The Exxon Pipeline <br />Corridor System further divides into the "Bayport to Bay town Corridor" and the "Friendswood <br />Corridor 520". Within the DuPont Pipeline Corridor, the pipeline will be constructed of High <br />Density Polyethylene (HDPE) PE 3408, 8" DR-9 carrier pipel12" DR-26 containment pipe. <br /> <br />C:\Noltcx\LaPoJtc.1tr <br /> <br />OFFICES WORLDWIDE <br />