Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Nay-13-98 02:04pm Fram-MDBIL PIPELINE <br /> <br />+2815913733 <br /> <br />T-218 P.08/IO F-5&O <br /> <br />.. <br /> <br />. . <br /> <br />HARRIS COUNTY FLOOD CONTROL DISTRICT <br />STANDARD NOTES FOR PIPELINE/UTILITY CROSSINGS <br /> <br />1. <br /> <br />The Harris County Flood Control Oistrict, <br />Department, shall be notified at least 48 hours <br />construction (713-684-4042). A copy of the <br />construct.ion drawings is required at this time. <br /> <br />2. At completion of construction, the pipeline owner shall <br />submit letter and record drawings to the Harris county Flood <br />Control District, Utility Department, requesting inspection <br />of items constructed in Barris County Flood Control District <br />right.-of-way. <br /> <br />ut.ility <br />prior to <br />approved <br /> <br />3. The pipeline owner or his contractor shall be responsible <br />for protecting, maintaining, and restoring backs lope <br />drainage systems. <br /> <br />4. Backfill is to be compacted in no qreater than 1-foot lifts <br />to the density of the undisturbed adjacent soil. <br /> <br />S. The pipeline owner or his contractor shall be responsible <br />for maintaining flow in the channel during construction and <br />restoring the channel to its original condition. <br /> <br />6.. All excess excavated material is to be removed from the <br />Harris County Flood Control District riqht-of-way. No fill <br />is to be placed within a desiqnated flood plain area without <br />first obtaining a fill permit from the e01m1\unity's flood <br />plain administrator. <br /> <br />-,. <br /> <br />8 <br />