Laserfiche WebLink
<br />-. <br /> <br />:- <br /> <br /> <br />-e_ _ <br />Richal'"c;t. <br /> <br />e' <br />N. <br /> <br />Pic.kett <br /> <br />_aUT... U."TY DU. "'aLa <br /> <br />.~ <br /> <br />P.O. Box 1866 - Uberty, Texas n575-1866 - (40~) 336-8481 - F.ax (409) 336-8485 <br />e-mail: richard.pickett@imsday.com <br />Land Titles/Curative <br /> <br />'Five Generations in Liberty, Liberty County, Texas <br />Col. EB. Pickett (1823-1882) - EB. Pickett, 5r.(1852-1926) -EW. Pickett (1883-1945) <br />E W. Pickett, Jr. (1914-1987) - Richard N. Pickett (1952 -) <br /> <br />October 6, 1998 <br /> <br />City of LaPorte <br />Attn: City Secretary <br />P.O. Box 1115 <br />La Porte, TX 77572 <br /> <br />RE: Proposed relocation of Mobil Hull to U.S.I. Chemical Co. 6" Ethylene Pipe Line (MC-42D) <br />- Strang Yard - City of LaPorte, Harris County, Texas <br /> <br />Gentlemen: <br /> <br />Pursuant to my conversation with Mr. Steve Gillett, Public Works Dept., on even date, Mobil <br />Oil Corporation respectfully requests the City of La Porte, Texas to pass ~n .:>rdinance granting a <br />permit to said corporation authorizing the construction of the subject pipeline under Avenue L, as <br />reflected on the attached surveyed plats, according to the terms and stipulations of the appropriate <br />City of La Porte Code governing issuance of same. <br /> <br />As requested, please find the following information concerning this project which will <br />indicate the time, manner, means and methods of construction, the commodity to be transported, <br />maximum pressures and temperatures of the transported commodity, and the size and number of <br />lines to be laid: <br /> <br />Time - Commence construction on October 271h, 1998, with a completion date of November <br />25th, 1998 (weather and ROW approvals permitting); <br /> <br />Manner, Means & Method of Construction - <br />450' of pipe will be installed by directional drill with boring equipment; <br />approximately 1,400' of pipe will be installed by open ditch method with the use of <br />backhoe equipment; <br /> <br />Commodity - Ethylene (see Material Safety Data Sheet attached hereto - 6 pages); <br /> <br />Maximum pressure - 1,440 PSI <br /> <br />Maximum temperature - 150 degrees Fahrenhei.t; 65 .degrees Celsius <br /> <br />Size of pipeline - <br /> <br />6.625-" 0.0. ~ 0.280" W.T. API-5LX-52 pipe <br /> <br />. .- <br />