Laserfiche WebLink
Ensey, Eric <br />From: David Miles [dcmiles@heritagelp.com] <br />Sent: Wednesday, November 11, 2015 11:07 AM <br />To: Ensey, Eric; Cramer, Ryan <br />Cc: Clydene Miles <br />Subject: FW: Storm Detention Storage Volume Estimations <br />Eric and Ryan <br />Please attach to La Porte Town Center preface. <br />Thank you so much. <br />David <br />STORM WATER RETENTION/DETENTION <br />The estimated storm detention storage volume required: 435,600 cf <br />Storm detention storage provided: <br />Font Pond: 67,500 cf <br />Rear Pond: 342,000 cf <br />Storage Provided within Parking Lot/miniature golf course: 65,340 cf <br />Total storm detention storage volume provided = 474,840 cf >435,600 cf required. <br />PARKING REQUIREMENTS <br />The estimated parking requirements are 976 <br />Parking spaces provided <br />Retail : 200 spaces <br />Restaurant : 320 spaces <br />Family entertainment Center : 220 spaces <br />Hotel and Conference : 194 spaces <br />Townhomes and Live/Work : 42 spaces <br />Spaces Required: 976 spaces <br />Spaces Provided: 979 spaces <br />Approx. "on street parking" 103 spaces <br />Total Space spaces provided: 1082 spaces * > 979 spaces required. <br />LANSDSCAPE REQUIREMENTS <br />The estimated landscape requirements will meet or exceed the 10% minimal requirement for each lot. <br />With " green " commons area objectives the entire 20 Acre tract will yield upwards to 15%. <br />Connectivity to the hike and bike trail and sidewalks with an assortment of Indigenous Trees. <br />Native Plant Vegetation with appointed Higher Maintenance Gardens . <br />Abundant Water Features and Patios and Plazas. <br />Tree lined frontage along HWY 146 (TBD). suggestion Palm Trees. <br />L Total Landscape area: Approximately 15%. Provided . > 10% required. <br />1 <br />