My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1975-1026
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1970's
>
1975
>
O-1975-1026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:32 PM
Creation date
7/20/2006 9:17:50 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
11/3/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.' <br /> <br />. <br /> <br />.' <br /> <br />, ~.-=;: <br /> <br />. ~~. "'-'~'-'7"<":""".-:,~--,-,'r:--.~""...~-,., <br />'. _.' ..~_ ..j.r~.~, c.1&.:1Z1"_' ~"S:lI..e. ....;...;-..-.;.. <br /> <br />. ;- ~. I .!..- ' <br /> <br />.:=.... <br /> <br />:':".-!*-L. <br /> <br />. \';" ~"''''~.'' ~ , <br /> <br />DETERMINA nON OF KV A - The KV A (kilovolt amperes) applicable to the Net Monthly Bill <br />shall be as follows: <br /> <br />(A) For the billing months of May through October the Kva shall be the average Kva <br />supplied during the 15 minute period of maximum use during the month then being billed, <br />as determined from meter readings. The Kva may be determined by the use of a standard <br />block interval integrated Kva meter or thermal ammeter calibrated to read Kva based on the <br />Company's standard voltage supplied. <br /> <br />(B) For fhe billing months of November through April the metered Kva will be <br />determined as outlined above and the billing Kva will be determined as follows: <br /> <br />(1) If the metered Kva is less than the Kva used for billing the preceding August <br />(hereinafter called August Kva) then the metered Kva will be the Kva used for billing. <br /> <br />(2) If the August Kva is less than the metered Kva then the August Kva will be <br />the Kva used for billing; provided, however, that if the August Kva is less than one-half <br />the metered Kva then one-half the metered Kva will be the Kva used for billing. <br /> <br />(3) The above provision (2) is not applicable to: <br /> <br />(a) new customers taking service subsequent to the start of the August <br />billing month. <br /> <br />(b) new 'customers taking service prior to the August billing month whose <br />total electrical equipment is not installed and in operation prior to the August <br />billing month. <br /> <br />(c) existing customers adding and/or operating new facilities during the <br />period subsequent to the August billing month and prior to the following billing <br />month of May. <br /> <br />Under such circumstances the metered Kva will be the Kva used for billing. <br /> <br />PA YMENT - Net bills are due when rendered and are payable within 10 days thereafter. Bills not <br />so paid shall be the net bill as rendered plus 10% of the first $50.00. <br /> <br />NOTICE - Electric Service hereunder is subject to the Company's Terms and Conditions for the <br />sale of Electric Service. <br /> <br />11.75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.